Difference between revisions of "EGI-InSPIRE:Sa1 2013-11-26"
Jump to navigation
Jump to search
(7 intermediate revisions by 6 users not shown) | |||
Line 1: | Line 1: | ||
{{Template: | {{Template:EGI-Inspire menubar}} | ||
{{Template:Inspire_reports_menubar}} | {{Template:Inspire_reports_menubar}} | ||
{{TOC_right}} | {{TOC_right}} | ||
=Progress of SA1 issues= | =Progress of SA1 issues= | ||
<!-- T. Ferrari --> | <!-- T. Ferrari --> | ||
Line 20: | Line 21: | ||
=SA1.2 Security= | =SA1.2 Security= | ||
<!-- D. Kelsey --> | <!-- D. Kelsey --> | ||
* usual ongoing operational duties | |||
* planning for EGI CSIRT F2F meeting (Bergen Aan Zee, 2-3 December) | |||
= SA1.3 Staged rollout = | = SA1.3 Staged rollout = | ||
<!-- J. Pina --> | <!-- J. Pina --> | ||
* preparation of the new release UMD 3.3.0 [https://wiki.egi.eu/wiki/UMD-3:UMD-3.3.0 wiki] | |||
=SA1.3 Integration= | =SA1.3 Integration= | ||
Line 29: | Line 33: | ||
=SA1.4 Central tools= | =SA1.4 Central tools= | ||
<!--E. Imamagic --> | <!--E. Imamagic --> | ||
SAM activities | |||
* providing support with Site Nagios deployment for verification testbed | |||
* analysis of ngi.SAM instances with 0% A/R | |||
* first SAM transition meeting held on Monday 25th | |||
GOCDB | |||
* discussion about adding multiple endpoints to existing service endpoint PI query | |||
=SA1.5 Accounting= | =SA1.5 Accounting= | ||
Line 37: | Line 48: | ||
=SA1.6 Helpdesk= | =SA1.6 Helpdesk= | ||
<!-- G. Grein --> | <!-- G. Grein --> | ||
*Preparing and testing of next GGUS release: | |||
**harmonizing internal structures | |||
**integration of CMS into GGUS | |||
*Ticket monitoring | |||
*Weekly phone conference | |||
=SA1.7 Support= | =SA1.7 Support= | ||
Line 44: | Line 60: | ||
<!-- A Krenek --> | <!-- A Krenek --> | ||
{| class="wikitable" | |||
|- | |||
! DMSU tickets flow Nov 17 -- 23 | |||
|- | |||
| assigned | |||
| 19 | |||
|- | |||
| back to tpm | |||
| 0 | |||
|- | |||
| reassigned to 3rd level | |||
| 12 | |||
|- | |||
| solved | |||
| 3 | |||
|} | |||
{| class="wikitable" | |||
|- | |||
! open DMSU tickets status | |||
|- | |||
| assigned | |||
| 2 | |||
|- | |||
| in progress | |||
| 0 | |||
|- | |||
| waiting for reply | |||
| 3 | |||
|- | |||
| on hold | |||
| 0 | |||
|} | |||
=SA1.8 Availability and core services= | =SA1.8 Availability and core services= |
Latest revision as of 18:30, 6 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Progress of SA1 issues
Nothing new to report.
Milestones/Deliverables
SA1.1 Activity Management
MEETINGS
ACTIVITIES
SA1.2 Security
- usual ongoing operational duties
- planning for EGI CSIRT F2F meeting (Bergen Aan Zee, 2-3 December)
SA1.3 Staged rollout
- preparation of the new release UMD 3.3.0 wiki
SA1.3 Integration
SA1.4 Central tools
SAM activities
- providing support with Site Nagios deployment for verification testbed
- analysis of ngi.SAM instances with 0% A/R
- first SAM transition meeting held on Monday 25th
GOCDB
- discussion about adding multiple endpoints to existing service endpoint PI query
SA1.5 Accounting
Repository
Portal
SA1.6 Helpdesk
- Preparing and testing of next GGUS release:
- harmonizing internal structures
- integration of CMS into GGUS
- Ticket monitoring
- Weekly phone conference
SA1.7 Support
Software Support
DMSU tickets flow Nov 17 -- 23 | |
---|---|
assigned | 19 |
back to tpm | 0 |
reassigned to 3rd level | 12 |
solved | 3 |
open DMSU tickets status | |
---|---|
assigned | 2 |
in progress | 0 |
waiting for reply | 3 |
on hold | 0 |