Difference between revisions of "EGI-InSPIRE:Sa1 2013-11-26"

From EGIWiki
Jump to: navigation, search
(Network Support)
 
(7 intermediate revisions by 6 users not shown)
Line 1: Line 1:
{{Template:Op menubar}}  
+
{{Template:EGI-Inspire menubar}}
 +
 
 
{{Template:Inspire_reports_menubar}}
 
{{Template:Inspire_reports_menubar}}
 
{{TOC_right}}  
 
{{TOC_right}}  
[[Category:SA1 weekly report]]
+
 
 
=Progress of SA1 issues=  
 
=Progress of SA1 issues=  
 
<!-- T. Ferrari -->
 
<!-- T. Ferrari -->
Line 20: Line 21:
 
=SA1.2 Security=  
 
=SA1.2 Security=  
 
<!-- D. Kelsey -->
 
<!-- D. Kelsey -->
 +
* usual ongoing operational duties
 +
* planning for EGI CSIRT F2F meeting (Bergen Aan Zee, 2-3 December)
  
 
= SA1.3 Staged rollout =
 
= SA1.3 Staged rollout =
 
<!-- J. Pina -->
 
<!-- J. Pina -->
 +
* preparation of the new release UMD 3.3.0 [https://wiki.egi.eu/wiki/UMD-3:UMD-3.3.0 wiki]
  
 
=SA1.3 Integration=
 
=SA1.3 Integration=
Line 29: Line 33:
 
=SA1.4 Central tools=  
 
=SA1.4 Central tools=  
 
<!--E. Imamagic -->
 
<!--E. Imamagic -->
 +
 +
SAM activities
 +
* providing support with Site Nagios deployment for verification testbed
 +
* analysis of ngi.SAM instances with 0% A/R
 +
* first SAM transition meeting held on Monday 25th
 +
GOCDB
 +
* discussion about adding multiple endpoints to existing service endpoint PI query
  
 
=SA1.5 Accounting=  
 
=SA1.5 Accounting=  
Line 37: Line 48:
 
=SA1.6 Helpdesk=  
 
=SA1.6 Helpdesk=  
 
<!-- G. Grein -->
 
<!-- G. Grein -->
 +
*Preparing and testing of next GGUS release:
 +
**harmonizing internal structures
 +
**integration of CMS into GGUS
 +
*Ticket monitoring
 +
*Weekly phone conference
  
 
=SA1.7 Support=
 
=SA1.7 Support=
Line 44: Line 60:
 
<!-- A Krenek -->
 
<!-- A Krenek -->
  
 +
{| class="wikitable"
 +
|-
 +
! DMSU tickets flow Nov 17 -- 23
 +
|-
 +
| assigned
 +
| 19
 +
|-
 +
| back to tpm
 +
| 0
 +
|-
 +
| reassigned to 3rd level
 +
| 12
 +
|-
 +
| solved
 +
| 3
 +
|}
 +
 +
{| class="wikitable"
 +
|-
 +
! open DMSU tickets status
 +
|-
 +
| assigned
 +
| 2
 +
|-
 +
| in progress
 +
| 0
 +
|-
 +
| waiting for reply
 +
| 3
 +
|-
 +
| on hold
 +
| 0
 +
|}
  
 
=SA1.8 Availability and core services=
 
=SA1.8 Availability and core services=

Latest revision as of 18:30, 6 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Progress of SA1 issues

Nothing new to report.

Milestones/Deliverables

SA1.1 Activity Management

MEETINGS

ACTIVITIES

SA1.2 Security

  • usual ongoing operational duties
  • planning for EGI CSIRT F2F meeting (Bergen Aan Zee, 2-3 December)

SA1.3 Staged rollout

  • preparation of the new release UMD 3.3.0 wiki

SA1.3 Integration

SA1.4 Central tools

SAM activities

  • providing support with Site Nagios deployment for verification testbed
  • analysis of ngi.SAM instances with 0% A/R
  • first SAM transition meeting held on Monday 25th

GOCDB

  • discussion about adding multiple endpoints to existing service endpoint PI query

SA1.5 Accounting

Repository

Portal

SA1.6 Helpdesk

  • Preparing and testing of next GGUS release:
    • harmonizing internal structures
    • integration of CMS into GGUS
  • Ticket monitoring
  • Weekly phone conference

SA1.7 Support

Software Support

DMSU tickets flow Nov 17 -- 23
assigned 19
back to tpm 0
reassigned to 3rd level 12
solved 3
open DMSU tickets status
assigned 2
in progress 0
waiting for reply 3
on hold 0

SA1.8 Availability and core services

Documentation

Meetings