Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Sa1 2013-11-19"

From EGIWiki
Jump to navigation Jump to search
 
(8 intermediate revisions by 6 users not shown)
Line 1: Line 1:
{{Template:Op menubar}}  
{{Template:EGI-Inspire menubar}}
{{Template:Inspire_reports_menubar}}
{{Template:Inspire_reports_menubar}} {{TOC_right}}  
{{TOC_right}}  
=Progress of SA1 issues= <!-- T. Ferrari --> Nothing new to report.  
[[Category:SA1 weekly report]]
=Progress of SA1 issues=  
<!-- T. Ferrari -->
Nothing new to report.


=Milestones/Deliverables=
=Milestones/Deliverables= <!-- T. Ferrari -->  
<!-- T. Ferrari -->


=SA1.1 Activity Management= <!-- S. Burke, T. Ferrari,  M. Krakowian, P. Solagna -->


=SA1.1 Activity Management=
MEETINGS
<!-- S. Burke, T. Ferrari,  M. Krakowian, P. Solagna -->


MEETINGS
*Federated Cloud meeting
*EISCAT3D horizon 2020 proposal planing meeting
*CVMFS call
*Grid Operations meeting


ACTIVITIES


=SA1.2 Security=
ACTIVITIES
<!-- D. Kelsey -->


= SA1.3 Staged rollout =
*QR14 preparation
<!-- J. Pina -->
*handling of GGUS tickets
*VO validation/decommissioning activities
*Monitor the SHA-2 migration
*Preparation of the RA call for interest


* Preparation of a new update for the UMD-3 (update 3). The list of products to be released are:
=SA1.2 Security= <!-- D. Kelsey -->
** unicore-hila v. 2.4.0
* usual ongoing security operations work
** cream-torque v. 2.1.1
* planning for SSC in DE and IT
** px v. 1.3.34
* planning for F2F meeting - first week of December
** arc-ce v. 3.0.3
** gridway v. 5.14.1
** dpm v. 1.8.7-
** bdii-core v. 1.5.4
** bdii-top v. 1.1.3
** canl v. 2.1.4
** cream-ce v. 1.16.2
** blah v. 1.20.3


=SA1.3 Integration=
= SA1.3 Staged rollout = <!-- J. Pina -->  
<!-- M. Krakowian  -->


=SA1.4 Central tools=
*Preparation of a new update for the UMD-3 (update 3). The list of products to be released are:
<!--E. Imamagic -->
**unicore-hila v. 2.4.0
**cream-torque v. 2.1.1
**px v. 1.3.34
**arc-ce v. 3.0.3
**gridway v. 5.14.1
**dpm v. 1.8.7-3
**bdii-core v. 1.5.4
**bdii-top v. 1.1.3
**canl v. 2.1.4
**cream-ce v. 1.16.2
**blah v. 1.20.3


* Weekly cloud monitoring meeting
=SA1.3 Integration= <!-- M. Krakowian  -->
* JRA1 meeting
* Planing cooperation between EUDAT and EGI within EISCAT 3D study case
** discussions about new service types in GOCDB & support for multiple endpoints per service
* SAM activities
** providing support to EUDAT with SAM installation via tool-admins list
** further analysis of problem with the new gLExec test - issue with tarball WNs
** analysis of issues with CLOUD-MON profile on the SAM GridMon


=SA1.5 Accounting=  
=SA1.4 Central tools= <!--E. Imamagic -->  
'''<!--A. Packer--> Repository '''


'''<!--A. Packer--> Portal'''
*Weekly cloud meeting
*JRA1 meeting
**discussions about new service types in GOCDB &amp; support for multiple endpoints per service
*Operations meeting
**presented the issue with the new gLExec test
*SAM activities
**providing support to EUDAT with SAM installation via tool-admins list
**further analysis of problem with the new gLExec test - issue with tarball WNs
**analysis of issues with CLOUD-MON profile on the SAM GridMon


=SA1.6 Helpdesk=  
= SA1.5 Accounting =
<!-- G. Grein -->
 
* Preparing and testing of next GGUS release:  
'''<!--A. Packer--> Repository '''
** harmonizing internal structures
 
** integration of CMS into GGUS
'''<!--A. Packer--> Portal'''
* Ticket monitoring
 
=SA1.6 Helpdesk= <!-- G. Grein -->  
 
*Preparing and testing of next GGUS release:  
**harmonizing internal structures  
**integration of CMS into GGUS  
*Ticket monitoring
 
=SA1.7 Support= <!--  Trompert -->


=SA1.7 Support=
<!--  Trompert -->
  * regular dashboard en ticketing work
  * regular dashboard en ticketing work
  * chasing nasty questions from Malgorzata
  * chasing nasty questions from Malgorzata
== Software Support ==
<!-- A Krenek -->


=SA1.8 Availability and core services=
== Software Support == <!-- A Krenek -->
<!--C. Kanellopoulos-->
 
== Documentation ==
{| class="wikitable"
<!-- M. Krakowian -->
|-
! DMSU tickets flow Nov 10 -- 16
|-
| assigned
| 16
|-
| back to tpm
| 0
|-
| reassigned to 3rd level
| 13
|-
| solved
| 3
|}
 
{| class="wikitable"
|-
! open DMSU tickets status
|-
| assigned
| 0
|-
| in progress
| 1
|-
| waiting for reply
| 3
|-
| on hold
| 0
|}
 
=SA1.8 Availability and core services= <!--P. Korosoglou-->  
 
*Published initial A/R results for October 2013
*Contact with Tanzania on setting up a RA for the egi catch all CA
*Setting up of new security nagios box almost done (minor configurations pending)
 
== Documentation == <!-- M. Krakowian -->  
* Meeting with FedSM expert: discussion about improvement of OLA/SLA framework.
* Work on EGI.eu SLA


= Meetings=
= Meetings= <!--all-->
<!--all-->

Latest revision as of 17:30, 6 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



=Progress of SA1 issues= Nothing new to report.

Milestones/Deliverables

SA1.1 Activity Management

MEETINGS

  • Federated Cloud meeting
  • EISCAT3D horizon 2020 proposal planing meeting
  • CVMFS call
  • Grid Operations meeting


ACTIVITIES

  • QR14 preparation
  • handling of GGUS tickets
  • VO validation/decommissioning activities
  • Monitor the SHA-2 migration
  • Preparation of the RA call for interest

SA1.2 Security

  • usual ongoing security operations work
  • planning for SSC in DE and IT
  • planning for F2F meeting - first week of December

SA1.3 Staged rollout

  • Preparation of a new update for the UMD-3 (update 3). The list of products to be released are:
    • unicore-hila v. 2.4.0
    • cream-torque v. 2.1.1
    • px v. 1.3.34
    • arc-ce v. 3.0.3
    • gridway v. 5.14.1
    • dpm v. 1.8.7-3
    • bdii-core v. 1.5.4
    • bdii-top v. 1.1.3
    • canl v. 2.1.4
    • cream-ce v. 1.16.2
    • blah v. 1.20.3

SA1.3 Integration

  • Planing cooperation between EUDAT and EGI within EISCAT 3D study case

SA1.4 Central tools

  • Weekly cloud meeting
  • JRA1 meeting
    • discussions about new service types in GOCDB & support for multiple endpoints per service
  • Operations meeting
    • presented the issue with the new gLExec test
  • SAM activities
    • providing support to EUDAT with SAM installation via tool-admins list
    • further analysis of problem with the new gLExec test - issue with tarball WNs
    • analysis of issues with CLOUD-MON profile on the SAM GridMon

SA1.5 Accounting

Repository

Portal

SA1.6 Helpdesk

  • Preparing and testing of next GGUS release:
    • harmonizing internal structures
    • integration of CMS into GGUS
  • Ticket monitoring

SA1.7 Support

* regular dashboard en ticketing work
* chasing nasty questions from Malgorzata

Software Support

DMSU tickets flow Nov 10 -- 16
assigned 16
back to tpm 0
reassigned to 3rd level 13
solved 3
open DMSU tickets status
assigned 0
in progress 1
waiting for reply 3
on hold 0

SA1.8 Availability and core services

  • Published initial A/R results for October 2013
  • Contact with Tanzania on setting up a RA for the egi catch all CA
  • Setting up of new security nagios box almost done (minor configurations pending)

Documentation

  • Meeting with FedSM expert: discussion about improvement of OLA/SLA framework.
  • Work on EGI.eu SLA

Meetings