Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Sa1 2013-09-24"

From EGIWiki
Jump to navigation Jump to search
 
(14 intermediate revisions by 5 users not shown)
Line 1: Line 1:
{{Template:Op menubar}}  
{{Template:EGI-Inspire menubar}}
 
{{Template:Inspire_reports_menubar}}
{{Template:Inspire_reports_menubar}}
{{TOC_right}}  
{{TOC_right}}  
[[Category:SA1 weekly report]]
 
=Progress of SA1 issues=  
=Progress of SA1 issues=  
<!-- T. Ferrari -->
<!-- T. Ferrari -->
Nothing new to report.
No SA1 open issues


=Milestones/Deliverables=
=Milestones/Deliverables=
<!-- T. Ferrari -->
<!-- T. Ferrari -->
 
* D4.9 Operations Architecture: white paper on Federated Operations being drafted, start of external review beginning of next week


=SA1.1 Activity Management=  
=SA1.1 Activity Management=  
Line 15: Line 16:


MEETINGS
MEETINGS
* Operations meeting: chairing and preparation of agenda
* OMB: preparation of agenda
* UCB (TF13): chairing and preparation of agenda. Main theme: collection of requirements for new services
* Resource Centre Forum (TF13): chairing and prepartion of agenda. Main themes: start of PUPPET community, kickoff of a GPGPU working group, announcement of call for resources for the EGI federated pool
* Planning meeting for transition of SAM services and status of A/R mini project, advancement of VO availability/reliability measurement


ACTIVITIES
ACTIVITIES
* integration of SAGrid and preparation of SAGrid MoU
* XSEDE/OSG integration meeting: next steps for enabling compchem and wenmr. No open OSG integration issues to address
* use case gathering for usage of the CVMFS infrastructure
* planning of GLUE2 validation operations


=SA1.2 Security=  
=SA1.2 Security=  
Line 28: Line 38:
= SA1.3 Staged rollout =
= SA1.3 Staged rollout =
<!-- J. Pina -->
<!-- J. Pina -->
* TF 2013 meetings


=SA1.3 Integration=
=SA1.3 Integration=
Line 33: Line 44:
* integration meeting during TF2013 with
* integration meeting during TF2013 with
** [https://wiki.egi.eu/w/images/7/7f/17.09_EGI_XSEDE_OSG_meeting.doc XSEDE and OSG]  
** [https://wiki.egi.eu/w/images/7/7f/17.09_EGI_XSEDE_OSG_meeting.doc XSEDE and OSG]  
** Desktop grids
** Desktop grids: discussion of integration as stand alone integrated infrastructure
** edupert
** edupert integration into GGUS for network troubleshoointg
* Integration operations session
* Chairing and preparation of integrated operations session at TF13
* first Cloud site certified - 100IT


=SA1.4 Central tools=  
=SA1.4 Central tools=  
<!--E. Imamagic -->
<!--E. Imamagic -->
* EGI TF 2013 meetings
* Planning transition of SAM central services
* Planning transition of messaging brokers.


=SA1.5 Accounting=  
=SA1.5 Accounting=  
'''<!--A. Packer--> Repository '''
No report received
 
'''<!--A. Packer--> Portal'''


=SA1.6 Helpdesk=  
=SA1.6 Helpdesk=  
Line 55: Line 69:
<!-- A Krenek -->
<!-- A Krenek -->


{| class="wikitable"
|-
! DMSU tickets flow Sep 15 -- 21
|-
| assigned
| 13
|-
| back to tpm
| 0
|-
| reassigned to 3rd level
| 8
|-
| solved
| 1
|}
{| class="wikitable"
|-
! open DMSU tickets status
|-
| assigned
| 0
|-
| in progress
| 6
|-
| waiting for reply
| 2
|-
| on hold
| 1
|}


=SA1.8 Availability and core services=
=SA1.8 Availability and core services=
<!--C. Kanellopoulos-->
<!--C. Kanellopoulos-->
== Documentation ==
 
<!-- M. Krakowian -->
Planning of technical SAM transition, discussion of future SAM support strategy at CERN and future of VO availability and reliability computation, review of the algorithm, transition of VO a/r computation to the mini project
nothing to report


= Meetings=
= Meetings=
<!--all-->
<!--all-->
* EUDAT conference, October 2013

Latest revision as of 17:17, 6 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Progress of SA1 issues

No SA1 open issues

Milestones/Deliverables

  • D4.9 Operations Architecture: white paper on Federated Operations being drafted, start of external review beginning of next week

SA1.1 Activity Management

MEETINGS

  • Operations meeting: chairing and preparation of agenda
  • OMB: preparation of agenda
  • UCB (TF13): chairing and preparation of agenda. Main theme: collection of requirements for new services
  • Resource Centre Forum (TF13): chairing and prepartion of agenda. Main themes: start of PUPPET community, kickoff of a GPGPU working group, announcement of call for resources for the EGI federated pool
  • Planning meeting for transition of SAM services and status of A/R mini project, advancement of VO availability/reliability measurement

ACTIVITIES

  • integration of SAGrid and preparation of SAGrid MoU
  • XSEDE/OSG integration meeting: next steps for enabling compchem and wenmr. No open OSG integration issues to address
  • use case gathering for usage of the CVMFS infrastructure
  • planning of GLUE2 validation operations

SA1.2 Security

  • lots of activity at the EGI TF in Madrid while keeping operational security activities going
  • ongoing handling of 3 security incidents
  • several ongoing risk assessments of new vulnerabilities
  • 3 training sessions at EGI TF and one double session on all operational security activities
  • AAI workshop on different levels of assurance (IGTF IOTA profile) at the EGI TF

SA1.3 Staged rollout

  • TF 2013 meetings

SA1.3 Integration

  • integration meeting during TF2013 with
    • XSEDE and OSG
    • Desktop grids: discussion of integration as stand alone integrated infrastructure
    • edupert integration into GGUS for network troubleshoointg
  • Chairing and preparation of integrated operations session at TF13
  • first Cloud site certified - 100IT

SA1.4 Central tools

  • EGI TF 2013 meetings
  • Planning transition of SAM central services
  • Planning transition of messaging brokers.

SA1.5 Accounting

No report received

SA1.6 Helpdesk

  • EGI TF2013 Madrid

SA1.7 Support

Software Support

DMSU tickets flow Sep 15 -- 21
assigned 13
back to tpm 0
reassigned to 3rd level 8
solved 1
open DMSU tickets status
assigned 0
in progress 6
waiting for reply 2
on hold 1

SA1.8 Availability and core services

Planning of technical SAM transition, discussion of future SAM support strategy at CERN and future of VO availability and reliability computation, review of the algorithm, transition of VO a/r computation to the mini project

Meetings

  • EUDAT conference, October 2013