Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

EGI-InSPIRE:Sa1 2013-08-13

From EGIWiki
Jump to navigation Jump to search
Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports


Progress of SA1 issues

Nothing new to report.

Milestones/Deliverables

MS427 Integrating Resources into the EGI Production Infrastructure: content is being collected and edited. The editor in charge is Malgorzata

D4.9 EGI Operations Architecture. The deliverable will be a white paper on federated operations. Work on the deliverable hasn't started yet

SA1.1 Activity Management

MEETINGS

  • Resource allocation task force meeting: definition of new mandate and new milestones to support the resource allocation mini project. A resource allocation procedure was discussed and is open for comments
  • participation to the 16th EISCAT International Symposium 2013 in Lancaster, UK, (http://eiscat2013.lancs.ac.uk)

ACTIVITIES

  • handling of operations tickets and VO services tickets
  • review of resource allocation procedure and collection of information about status of resource allocation at XSEDE
  • status assessment of EMI-1 decommissioning campaign: only 2 service end points are left for being upgraded
  • status assessment of SHA-2 migration campaign of EMI-2 services that still do not support this capability
  • work on QR13 started today

SA1.2 Security

  • quiet week - many on holiday
  • normal operational activities
  • emergency suspension project
  • cleaning mail lists and other access control
  • updating of new procedure documents

SA1.3 Staged rollout

  • Staged Rollout announcements:
    • EMI.wms v. 3.6.0
    • EMI.bdii-site v. 1.2.1
    • EMI.bdii-top v. 1.1.1
  • preparation of new release (EMI-3.2.0)

SA1.3 Integration

  • joint EGI/EUDAT/EISCAT-3D study case will be presented to get feedback: 'Towards the big data strategies for EISCAT-3D' to EISCAT scientist'. More information about this study case is available at:

https://documents.egi.eu/document/1839 and https://wiki.egi.eu/wiki/EGI_ENVRI

  • followup of XSEDE 2013 actions, editing of information and links in the EGI-XSEDE collaboration wiki page
  • discussion of next steps for enabling COMPCHEM and WeNMR on XSEDE

SA1.4 Central tools

  • problem with central SAM instance for monitoring of EGI operational tools fixed, service back to production

SA1.5 Accounting

Repository

  • More sites are now publishing from the ARC/Jura accounting software.
  • A site is now publishing from both CREAM and ARC.
  • EDGI Desktop Grid accounting test successful. Now moving to production.
  • Continuing to move other sites to SSM2.0/EMI3 Apel client.
  • A scheduled network outage caused minor disruption to service Tuesday 6th August. No data issues from this and publishing/processing was resumed.

Portal

SA1.6 Helpdesk

  • Ticket monitoring
  • Implementing feature requests for next GGUS release
  • Preparing slides for EGI TF in Madrid

SA1.7 Support

  • followup of new sites with new alarms for software retirement
  • follow up of RPI, sites to be suspended, top BDII A/R, Unknowns
  • handling topics of the SAM nagios WG.
  • Certfication of SAGrid

Software Support

DMSU tickets flow Aug 4 - 10
assigned 14
back to tpm 1
reassigned to 3rd level 10
solved 2
open DMSU tickets status
assigned 0
in progress 1
waiting for reply 1
on hold 3

SA1.8 Availability and core services

Distribution of July availability and reliability figures

Documentation

Review of procedure 06 in progress

Meetings

  • EGI Technical Forum, Madrid, Sep 2013
  • FedSM training programme, co-located with the EGI Technical Forum