Difference between revisions of "EGI-InSPIRE:Sa1 2013-08-06"
Jump to navigation
Jump to search
(3 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Template: | {{Template:EGI-Inspire menubar}} | ||
{{Template:Inspire_reports_menubar}} | {{Template:Inspire_reports_menubar}} | ||
{{TOC_right}} | {{TOC_right}} | ||
=Progress of SA1 issues= | =Progress of SA1 issues= | ||
<!-- T. Ferrari --> | <!-- T. Ferrari --> | ||
Line 65: | Line 66: | ||
<!-- A Krenek --> | <!-- A Krenek --> | ||
{| class="wikitable" | |||
|- | |||
! DMSU tickets flow July 28 - Aug 3 | |||
|- | |||
| assigned | |||
| 10 | |||
|- | |||
| back to tpm | |||
| 1 | |||
|- | |||
| reassigned to 3rd level | |||
| 7 | |||
|- | |||
| solved | |||
| 1 | |||
|} | |||
== Network Support == | == Network Support == |
Latest revision as of 17:14, 6 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Progress of SA1 issues
Nothing new to report.
Milestones/Deliverables
SA1.1 Activity Management
MEETINGS
ACTIVITIES
- handling of GGUS tickets and ongoing VO ID card update campaign
SA1.2 Security
- usual routine operations
- Prepared quarterly report
- Work on Emergency suspension
- prepare for NGI-DE SSC run
- updating framework for SSC runs
- ongoing work on procedures documents
- planning for EGI TF
SA1.3 Staged rollout
- creation of the xml release for the EMI-3 Update 7
- APEL v. 2.2.0 SR announcement
SA1.3 Integration
- definition of draft agenda of TF13 session on integrated operations
- status assessment of middleware and e-infrastructure integration
- ongoing work on Cloud site certification
SA1.4 Central tools
SA1.5 Accounting
Repository
Portal
SA1.6 Helpdesk
- Ticket monitoring
- Implementing feature requests for next GGUS release
- Preparing poster for CHEP
- Preparing slides for EGI TF in Madrid
SA1.7 Support
- followup of new sites with new alarms for software retirement
- follow up of RPI, sites to be suspended, top BDII A/R, Unknowns
- handling topics of the SAM nagios WG.
- Certfication of SAGrid
Software Support
DMSU tickets flow July 28 - Aug 3 | |
---|---|
assigned | 10 |
back to tpm | 1 |
reassigned to 3rd level | 7 |
solved | 1 |