Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Sa1 2013-07-09"

From EGIWiki
Jump to navigation Jump to search
 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Template:Op menubar}}  
{{Template:EGI-Inspire menubar}}
 
{{Template:Inspire_reports_menubar}}
{{Template:Inspire_reports_menubar}}
{{TOC_right}}  
{{TOC_right}}  
[[Category:SA1 weekly report]]
 
=Progress of SA1 issues=  
=Progress of SA1 issues=  
<!-- T. Ferrari -->
<!-- T. Ferrari -->
Line 41: Line 42:
* cleaning various CSIRT groups and mail lists
* cleaning various CSIRT groups and mail lists
* work on emergency suspension design
* work on emergency suspension design
* preparation of ARGUS deployment programme to enforce the policy on central user emergency suspension


= SA1.3 Staged rollout =
= SA1.3 Staged rollout =
Line 55: Line 57:
=SA1.3 Integration=
=SA1.3 Integration=
<!-- M. Krakowian  -->
<!-- M. Krakowian  -->
* ongoing work Cloud site certification
* ongoing work on Cloud site certification
* requirements gathering of EUDAT requirements for monitoring (SAM)
* requirements gathering of PRACE Requirements for registration of services (GOCDB)
* ongoing South Africa Grid integration


=SA1.4 Central tools=  
=SA1.4 Central tools=  
Line 123: Line 128:
== Network Support  ==
== Network Support  ==
<!-- Mario Reale -->
<!-- Mario Reale -->
*Preparation of eduPERT training at TF13
*Discussion of followup of IPv6 coordination activities


=SA1.8 Availability and core services=
=SA1.8 Availability and core services=
Line 128: Line 135:
== Documentation ==
== Documentation ==
<!-- M. Krakowian -->
<!-- M. Krakowian -->
Setup of catch all services for support of DRIHM testing activities


= Meetings=
= Meetings=
<!--all-->
<!--all-->
* XSEDE 2013, July 2013 (San Diego)
* FedSM meeting, August 2013 (Helsinki)
* ENVRI meeting, September 2013 (Clermont Ferrand)
* EGI Technical Forum 2013

Latest revision as of 17:21, 6 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Progress of SA1 issues

(SA1) PQ11: NGI operations sustainability https://rt.egi.eu/rt/Ticket/Display.html?id=4981 Results of a survey on the federation of NGI services opened in June are being collected.

Milestones/Deliverables

MS431 Deployed Middleware Support Unit Operations procedures: external reviews received, authors contacted to solicit progress to produce a new version

MS427 Integrating Resources into the EGI Production infrastructure: ToC being discussed

SA1.1 Activity Management

MEETINGS

  • Operations meeting, chaired and agenda preparation
  • Federated cloud meeting
  • WeNMR meeting on XSEDE integration activities
  • WLCG operations meeting

ACTIVITIES

  • 'Updating VO ID cards' campaign and decommission of obsoleted VOs
  • ops VO management
  • Reviewed MoU with OSG
  • Circulated broadcast with the StoRM retirement calendar
  • status review of South Africa integration process
  • finalization of TF13 programme - core infrastructure track, contributors contacted to draft session agendas
  • preparation of July OMB agenda
  • integration of EGI.eu operations tests into the operations dashboard
  • status assessment
  • preparation of task descriptions for re-rebidding of global tasks

SA1.2 Security

  • usual ongoing routine business
  • cleaning various CSIRT groups and mail lists
  • work on emergency suspension design
  • preparation of ARGUS deployment programme to enforce the policy on central user emergency suspension

SA1.3 Staged rollout

  • Regular stage rollout activities.
    • New components into SR:
      • IGE.globus-default-security - 5.2.4
    • Components moved into UMD store:
      • IGE.globus-gridftp - 5.2.4

SA1.3 Integration

  • ongoing work on Cloud site certification
  • requirements gathering of EUDAT requirements for monitoring (SAM)
  • requirements gathering of PRACE Requirements for registration of services (GOCDB)
  • ongoing South Africa Grid integration

SA1.4 Central tools

  • A new version of GOCDBv5 has been deployed for testing (https://gocdb-test.esc.rl.ac.uk/v5).
  • StoRM EMI-1 test added to midmon on Monday.
  • Tracking down progress of User DN publishing probe.

SA1.5 Accounting

Repository

Portal

SA1.6 Helpdesk

  • Ticket monitoring
  • preparing next release and implementing feature requests
  • weekly phone conference for discussing features and requests to be implemented
  • discussions on further development of GGUS
  • prepared slides for next GGUS-AB meeting

SA1.7 Support

Software Support

DMSU tickets flow June 30 -July 6
assigned 7
back to tpm 0
reassigned to 3rd level 3
solved 2
open DMSU tickets status
assigned 0
in progress 0
waiting for reply 4
on hold 1

Network Support

  • Preparation of eduPERT training at TF13
  • Discussion of followup of IPv6 coordination activities

SA1.8 Availability and core services

Documentation

Setup of catch all services for support of DRIHM testing activities

Meetings

  • XSEDE 2013, July 2013 (San Diego)
  • FedSM meeting, August 2013 (Helsinki)
  • ENVRI meeting, September 2013 (Clermont Ferrand)
  • EGI Technical Forum 2013