Difference between revisions of "EGI-InSPIRE:Sa1 2013-05-21"
Jump to navigation
Jump to search
(8 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
{{Template: | {{Template:EGI-Inspire menubar}} | ||
{{Template:Inspire_reports_menubar}} | {{Template:Inspire_reports_menubar}} | ||
{{TOC_right}} | {{TOC_right}} | ||
=Progress of SA1 issues= | =Progress of SA1 issues= | ||
<!-- T. Ferrari --> | <!-- T. Ferrari --> | ||
Line 50: | Line 51: | ||
<!-- J. Pina --> | <!-- J. Pina --> | ||
* On the | * On the 24th of May it was release the fifth update of [http://repository.egi.eu/2013/05/24/release-umd-2-5-0/ UMD-2 ] with total of 10 products mainly from EMI. | ||
* Preparation of the UMD- | * Preparation of the WMS 3.5.1 security update for UMD-3. | ||
=SA1.3 Integration= | =SA1.3 Integration= | ||
Line 62: | Line 63: | ||
=SA1.5 Accounting= | =SA1.5 Accounting= | ||
'''<!--A. Packer--> Repository ''' | '''<!--A. Packer--> Repository ''' | ||
* The new APEL server central repository is now receiving data from several sites running the EMI 3 APEL client. | |||
* ARC & QCG/MAPPER are also testing, successfully publishing CAR using SSM2; the data is not always in the correct format so we are working on this with them. | |||
'''<!--A. Packer--> Portal''' | '''<!--A. Packer--> Portal''' | ||
Line 75: | Line 79: | ||
=SA1.7 Support= | =SA1.7 Support= | ||
<!-- Trompert --> | <!-- Trompert --> | ||
* followup of new sites with new EMI-1 alarms for software retirement | |||
* follow up of RPI, sites to be suspended, top BDII A/R, Unknowns | |||
* investigation status changes of sites | |||
* setting up database to track top bdii availability, availability/reliability,unknowns of sites, certification status changes and the rod performance index over time. | |||
== Software Support == | == Software Support == | ||
<!-- A Krenek --> | <!-- A Krenek --> | ||
Line 102: | Line 109: | ||
== Documentation == | == Documentation == | ||
<!-- M. Krakowian --> | <!-- M. Krakowian --> | ||
* Update of MS425 based on internal review results and comments (ongoing) | |||
= Meetings= | = Meetings= | ||
<!--all--> | <!--all--> | ||
* ENVRI f2f meeting (WP3), UvA, May 2013 | * ENVRI f2f meeting (WP3), UvA, May 2013 |
Latest revision as of 17:25, 6 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Progress of SA1 issues
Nothing new to report.
Milestones/Deliverables
MS425: malgorzata to update on status of milestone MS431: Deployed Middleware Support Unit Operations procedures: Ales Krenek to provide information on status
SA1.1 Activity Management
MEETINGS
- bi-weekly operations meeting: agenda and contributions (TF, PS)
- Contribution to WLCG operations meeting (TF, PS)
- WLCG Management Board (TF)
- EuroARGO meeting (MK)
- EISCAT3D meeting (MK)
ACTIVITIES
- preparation of SHA-2 monitoring plan
- assessment of SHA-2 migration calendar
- assessment of status of EMI 1 StoRM bug fixing, negotiation of extension of support calendar, planning of future release, change of decommissioning plan and related monitoring infrastructure
- negotiation of support of EMI UI and WN, assessment of future support of torque configurations
- preparation OMB agenda and followup of actions
- review of SA1 PY3 metrics, all values assessed and fixed where needed in metrics portal
- review of project metrics in metrics portal and feedback to developers to implement updates
- preparation of periodic report
- D1.13 review: review of SA1 metrics, PY4 targets and and strategic metrics
- preparation of DRIHM testbed, creation of support sso, collection of contact information from NGIs
- preparation of VPH testbed
- feedback to NIL bulletin
- assessment of progress of MiniP on Availability/Reliability computation
- preparation of TF13 operations track completed, all abstracts submitted to indico
- preparation of council document on resource allocation
SA1.2 Security
- Lots of activity assessing and handling a critical Linux kernel vulnerability (EGI-ADV-20130514)
- Annual reporting for PY3
- SVG: 4 new vulnerabilities reported and being handled
- Monthly CSIRT team meeting (16 May)
- Monthly SVG meeting (16 May)
SA1.3 Staged rollout
- On the 24th of May it was release the fifth update of UMD-2 with total of 10 products mainly from EMI.
- Preparation of the WMS 3.5.1 security update for UMD-3.
SA1.3 Integration
- review of PROC09 Resource Centre Registration and Certification in terms of cloud resources integration and certification
SA1.4 Central tools
SA1.5 Accounting
Repository
- The new APEL server central repository is now receiving data from several sites running the EMI 3 APEL client.
- ARC & QCG/MAPPER are also testing, successfully publishing CAR using SSM2; the data is not always in the correct format so we are working on this with them.
Portal
SA1.6 Helpdesk
- Ticket monitoring
- Preparation of the next GGUS release
- Cleaning up of all support units in preparation to the end of EMI/IGE projects
- Defining new structure of PTs
- Testing of new features on GGUS test instance
SA1.7 Support
- followup of new sites with new EMI-1 alarms for software retirement
- follow up of RPI, sites to be suspended, top BDII A/R, Unknowns
- investigation status changes of sites
- setting up database to track top bdii availability, availability/reliability,unknowns of sites, certification status changes and the rod performance index over time.
Software Support
DMSU tickets flow May 12 -- 18 | |
---|---|
assigned | 9 |
back to tpm | 0 |
reassigned to 3rd level | 8 |
solved | 2 |
Network Support
SA1.8 Availability and core services
Documentation
- Update of MS425 based on internal review results and comments (ongoing)
Meetings
- ENVRI f2f meeting (WP3), UvA, May 2013