Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Sa1 2013-05-21"

From EGIWiki
Jump to navigation Jump to search
Line 50: Line 50:
<!-- J. Pina -->
<!-- J. Pina -->


* On the 14th of May it was release of the first [http://repository.egi.eu/2013/05/14/all-umd-3-products/ UMD-3 release] with total of 23 products mainly from EMI.
* On the 24th of May it was release the fifth update of [http://repository.egi.eu/2013/05/24/release-umd-2-5-0/ UMD-2 ] with total of 10 products mainly from EMI.
* Preparation of the UMD-2 update 5.
* Preparation of the WMS 3.5.1 security update for UMD-3.


=SA1.3 Integration=
=SA1.3 Integration=

Revision as of 14:57, 28 May 2013

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports


Progress of SA1 issues

Nothing new to report.

Milestones/Deliverables

MS425: malgorzata to update on status of milestone MS431: Deployed Middleware Support Unit Operations procedures: Ales Krenek to provide information on status

SA1.1 Activity Management

MEETINGS

  • bi-weekly operations meeting: agenda and contributions (TF, PS)
  • Contribution to WLCG operations meeting (TF, PS)
  • WLCG Management Board (TF)
  • EuroARGO meeting (MK)
  • EISCAT3D meeting (MK)

ACTIVITIES

  • preparation of SHA-2 monitoring plan
  • assessment of SHA-2 migration calendar
  • assessment of status of EMI 1 StoRM bug fixing, negotiation of extension of support calendar, planning of future release, change of decommissioning plan and related monitoring infrastructure
  • negotiation of support of EMI UI and WN, assessment of future support of torque configurations
  • preparation OMB agenda and followup of actions
  • review of SA1 PY3 metrics, all values assessed and fixed where needed in metrics portal
  • review of project metrics in metrics portal and feedback to developers to implement updates
  • preparation of periodic report
  • D1.13 review: review of SA1 metrics, PY4 targets and and strategic metrics
  • preparation of DRIHM testbed, creation of support sso, collection of contact information from NGIs
  • preparation of VPH testbed
  • feedback to NIL bulletin
  • assessment of progress of MiniP on Availability/Reliability computation
  • preparation of TF13 operations track completed, all abstracts submitted to indico
  • preparation of council document on resource allocation

SA1.2 Security

  • Lots of activity assessing and handling a critical Linux kernel vulnerability (EGI-ADV-20130514)
  • Annual reporting for PY3
  • SVG: 4 new vulnerabilities reported and being handled
  • Monthly CSIRT team meeting (16 May)
  • Monthly SVG meeting (16 May)

SA1.3 Staged rollout

  • On the 24th of May it was release the fifth update of UMD-2 with total of 10 products mainly from EMI.
  • Preparation of the WMS 3.5.1 security update for UMD-3.

SA1.3 Integration

  • review of PROC09 Resource Centre Registration and Certification in terms of cloud resources integration and certification

SA1.4 Central tools

SA1.5 Accounting

Repository

  • The new APEL server central repository is now receiving data from several sites running the EMI 3 APEL client.
  • ARC & QCG/MAPPER are also testing, successfully publishing CAR using SSM2; the data is not always in the correct format so we are working on this with them.

Portal

SA1.6 Helpdesk

  • Ticket monitoring
  • Preparation of the next GGUS release
  • Cleaning up of all support units in preparation to the end of EMI/IGE projects
  • Defining new structure of PTs
  • Testing of new features on GGUS test instance

SA1.7 Support

  • followup of new sites with new EMI-1 alarms for software retirement
  • follow up of RPI, sites to be suspended, top BDII A/R, Unknowns
  • investigation status changes of sites
  • setting up database to track top bdii availability, availability/reliability,unknowns of sites, certification status changes and the rod performance index over time.

Software Support

DMSU tickets flow May 12 -- 18
assigned 9
back to tpm 0
reassigned to 3rd level 8
solved 2

Network Support

SA1.8 Availability and core services

Documentation

  • Update of MS425 based on internal review results and comments (ongoing)

Meetings

  • ENVRI f2f meeting (WP3), UvA, May 2013