Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Sa1 2013-04-30"

From EGIWiki
Jump to navigation Jump to search
Line 80: Line 80:
== Software Support ==
== Software Support ==
<!-- A Krenek -->
<!-- A Krenek -->
No report received
{| class="wikitable"
|-
! DMSU tickets flow Apr 7-13
|-
| assigned
| 17
|-
| back to tpm
| 0
|-
| reassigned to 3rd level
| 9
|-
| solved
| 4
|}


== Network Support  ==
== Network Support  ==

Revision as of 13:51, 21 May 2013

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports


Progress of SA1 issues

Nothing new to report.

Milestones/Deliverables

  • D4.8 Assessment of infrastructure --> external review
  • MS425 OLA framework --> in external review as of today

SA1.1 Activity Management

MEETINGS

  • bi-weekly operations meeting: chairing and preparation of agena
  • WLCG operations coordination meeting: contribution on various topics like new GGUS workflows, support levels, and support of software after EMI
  • EGI-XSEDE collaboration meeting
  • participation and contribution to last EMI EMT meeting about the start of the UMD Release Team as continuation of the EMI EMT meeting

ACTIVITIES

  • discussion of support of various EMI products after EMI: WMS (will be supported), glite info sys (will be supported), EMI Common (in progress)
  • review/editing of D4.8, revision of accounting figures
  • review of MS425
  • preparation work for the MAPPER use cases (EGI, EUDAT, PRACE)
  • review of ENVRI-related support activities (EuroARGO and EISCAT 3D)
  • assessment of status of APEL publisher staged rollout (EMI3): staged rollout on hold because of problems with EMI2 CREAM found in UMD validation

SA1.2 Security

  • main activity has been the face to face meeting of the EGI CSIRT team in Linkoping, Sweden (24-25 April 2013)
  • little else to report

SA1.3 Staged rollout

  • Pursuing the activities for the UMD-2 release
  • Continuing of the activities regarding the UMD-3 topics:
    • Continuing of the UMD-3 staged rollout activities:
      • SR announcements for the following products: glexec (1.2.0), arc-ce (3.0.0), UNICORE/X (6.0.0), UNICORE XUUDB (2.0.0), CREAM (1.15.1)
      • Products ready for release: argus (1.6.0), lcg-info-clients (1.0.1), LB (4.0.4), DMP (1.8.6)

SA1.3 Integration

Contacts with PL and UK for support of nano-materials use case (MAPPER)

SA1.4 Central tools

Operations as usual.

SA1.5 Accounting

Repository

  • Client site running APEL 3 client, now publishing in production, other sites testing.
  • Other external CPU accounting clients (ARC) using SSM 2.0 continue testing as bugs have been fixed.
  • APEL Consumer system (hardware replaced) now working as required.

Portal

  • Continuing refactor of the code
  • Changes for new accounting.
  • Fix for Unknown Discipline counting on VO Discipline CVS report.
  • Cloud accounting fixes

SA1.6 Helpdesk

  • Ticket monitoring
  • GGUS release on 2013-04-24
  • Preparation of the following GGUS release

SA1.7 Support

  • followup of new sites with new EMI-1 alarms for software retirement
  • follow up of RPI, sites to be suspended, top BDII A/R, Unknowns
  • Decommissioning of ROC_IGALC

Software Support

DMSU tickets flow Apr 7-13
assigned 17
back to tpm 0
reassigned to 3rd level 9
solved 4

Network Support

Preparation of training session for TF13

SA1.8 Availability and core services

Handling of catch all VOMS request for the DRIHM community, which is ready to start production activities in a few days.

Documentation

Review of procedure for decommissioning of unsupported software.

Meetings

ENVRI WP3 meeting, UvA, May 2013