EGI-InSPIRE:Sa1 2013-04-02
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Progress of SA1 issues
Nothing new to report.
Milestones/Deliverables
D4.8: Annual assessment of the production infrastructure. Gathering of raw data completed, working towards finalizing text.
SA1.1 Activity Management
MEETINGS
- Federated cloud task force
ACTIVITIES
- Contacted Rob Quick for a presentation about OSG Champions activity (CF2013)
- ops VO management
SA1.2 Security
- Not much because of Easter
- Central Emergency User Suspension
- Preparing for the EGI CF in Manchester
- One new vulnerability reported
- EGI CSIRT Compromised Certificate procedure revised assuming Emergency suspension is in place, including criteria for emergency suspension
SA1.3 Staged rollout
- creation of the release for the last EMI-1 products update 24
- Creation of the last EMI-2 update 10
- Ready for production:
- EMI: WMS 3.4.1, Cream-1.14.3
- IGE Gsisshterm 1.3.4, Gram5 5.2.3 and Gridftp 5.2.3;
- Ready for production:
- Continuing of the activities regarding the UMD-3 EMI-3 topics :
- Continuing of the UMD-3 staged rollout activities:
- SR announcements for the following products: Argus (1.6.0); DPM & LFC (1.8.6); WMS (3.5.0); WN (3.0.0); UI (3.0.0); LB (4.0.4).
- Continuing of the UMD-3 staged rollout activities:
SA1.3 Integration
SA1.4 Central tools
SA1.5 Accounting
Repository
Portal
SA1.6 Helpdesk
- Ticket monitoring
- Preparing GGUS April release
- Weekly phone conference for discussing open requests (shopping list) on GGUS
- Preparing relevant meetings at EGI CF in Manchester
SA1.7 Support
- followup of new sites with new EMI-1 alarms for software retirement
- follow up of RPI, sites to be suspended, top BDII A/R, Unknowns
- preparation ROD meeting next week at the CF
Software Support
Contribution to D5.9 provided. Otherwise nothing special to report
DMSU tickets flow Mar 24-31 | |
---|---|
assigned | 15 |
back to tpm | 0 |
reassigned to 3rd level | 14 |
solved | 4 |
open DMSU tickets status | |
---|---|
assigned | 2 |
in progress | 3 |
waiting for reply | 1 |
on hold | 1 |
Network Support
SA1.8 Availability and core services
Nothing new to report
Documentation
Nothing new to report