Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

EGI-InSPIRE:Sa1 2013-04-02

From EGIWiki
Jump to navigation Jump to search
Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports


Progress of SA1 issues

Nothing new to report.

Milestones/Deliverables

D4.8: Annual assessment of the production infrastructure. Gathering of raw data completed, working towards finalizing text.

SA1.1 Activity Management

MEETINGS - Federated cloud task force

ACTIVITIES - Contacted Rob Quick for a presentation about OSG Champions activity (CF2013) - ops VO management -

SA1.2 Security

  • Not much because of Easter
  • Central Emergency User Suspension
  • Preparing for the EGI CF in Manchester
  • One new vulnerability reported
  • EGI CSIRT Compromised Certificate procedure revised assuming Emergency suspension is in place, including criteria for emergency suspension

SA1.3 Staged rollout

  • creation of the release for the last EMI-1 products update 24
  • Creation of the last EMI-2 update 10
    • Ready for production:
      • EMI: WMS 3.4.1, Cream-1.14.3
      • IGE Gsisshterm 1.3.4, Gram5 5.2.3 and Gridftp 5.2.3;
  • Continuing of the activities regarding the UMD-3 EMI-3 topics :
    • Continuing of the UMD-3 staged rollout activities:
      • SR announcements for the following products: Argus (1.6.0); DPM & LFC (1.8.6); WMS (3.5.0); WN (3.0.0); UI (3.0.0); LB (4.0.4).

SA1.3 Integration

SA1.4 Central tools

SA1.5 Accounting

Repository

Portal

SA1.6 Helpdesk

  • Ticket monitoring
  • Preparing GGUS April release
  • Weekly phone conference for discussing open requests (shopping list) on GGUS
  • Preparing relevant meetings at EGI CF in Manchester

SA1.7 Support

Software Support

Contribution to D5.9 provided. Otherwise nothing special to report

DMSU tickets flow Mar 24-31
assigned 15
back to tpm 0
reassigned to 3rd level 14
solved 4
open DMSU tickets status
assigned 2
in progress 3
waiting for reply 1
on hold 1

Network Support

SA1.8 Availability and core services

Documentation

Nothing new to report

Meetings