EGI-InSPIRE:Sa1 2013-04-02

From EGIWiki
Revision as of 22:39, 2 April 2013 by Psolagna (talk | contribs) (SA1.1 Activity Management)
Jump to: navigation, search
Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports


Progress of SA1 issues

Nothing new to report.

Milestones/Deliverables

D4.8: Annual assessment of the production infrastructure. Gathering of raw data completed, working towards finalizing text.

SA1.1 Activity Management

MEETINGS - Federated cloud task force

ACTIVITIES - Contacted Rob Quick for a presentation about OSG Champions activity (CF2013) - ops VO management -

SA1.2 Security

  • Not much because of Easter
  • Central Emergency User Suspension
  • Preparing for the EGI CF in Manchester
  • One new vulnerability reported
  • EGI CSIRT Compromised Certificate procedure revised assuming Emergency suspension is in place, including criteria for emergency suspension

SA1.3 Staged rollout

  • creation of the release for the last EMI-1 products update 24
  • Creation of the last EMI-2 update 10
    • Ready for production:
      • EMI: WMS 3.4.1, Cream-1.14.3
      • IGE Gsisshterm 1.3.4, Gram5 5.2.3 and Gridftp 5.2.3;
  • Continuing of the activities regarding the UMD-3 EMI-3 topics :
    • Continuing of the UMD-3 staged rollout activities:
      • SR announcements for the following products: Argus (1.6.0); DPM & LFC (1.8.6); WMS (3.5.0); WN (3.0.0); UI (3.0.0); LB (4.0.4).

SA1.3 Integration

SA1.4 Central tools

SA1.5 Accounting

Repository

Portal

SA1.6 Helpdesk

  • Ticket monitoring
  • Preparing GGUS April release
  • Weekly phone conference for discussing open requests (shopping list) on GGUS
  • Preparing relevant meetings at EGI CF in Manchester

SA1.7 Support

Software Support

Contribution to D5.9 provided. Otherwise nothing special to report

DMSU tickets flow Mar 24-31
assigned 15
back to tpm 0
reassigned to 3rd level 14
solved 4
open DMSU tickets status
assigned 2
in progress 3
waiting for reply 1
on hold 1

Network Support

SA1.8 Availability and core services

Documentation

Nothing new to report

Meetings