Difference between revisions of "EGI-InSPIRE:Sa1 2013-04-02"
Jump to navigation
Jump to search
(10 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
{{Template: | {{Template:EGI-Inspire menubar}} | ||
{{Template:Inspire_reports_menubar}} | {{Template:Inspire_reports_menubar}} | ||
{{TOC_right}} | {{TOC_right}} | ||
=Progress of SA1 issues= | =Progress of SA1 issues= | ||
<!-- T. Ferrari --> | <!-- T. Ferrari --> | ||
Line 15: | Line 16: | ||
MEETINGS | MEETINGS | ||
* Federated cloud task force | |||
ACTIVITIES | ACTIVITIES | ||
* Contacted Rob Quick for a presentation about OSG Champions activity (CF2013) | |||
* ops VO management | |||
=SA1.2 Security= | =SA1.2 Security= | ||
<!-- D. Kelsey --> | <!-- D. Kelsey --> | ||
* Not much because of Easter | |||
* Central Emergency User Suspension | |||
* Preparing for the EGI CF in Manchester | |||
* One new vulnerability reported | |||
* EGI CSIRT Compromised Certificate procedure revised assuming Emergency suspension is in place, including criteria for emergency suspension | |||
= SA1.3 Staged rollout = | = SA1.3 Staged rollout = | ||
<!-- J. Pina --> | <!-- J. Pina --> | ||
* creation of the release for the last EMI-1 products [http://www.eu-emi.eu/emi-1-kebnekaise-updates/-/asset_publisher/Ir6q/content/update-24-28-03-2013-v-1-14-2-2 update 24] | |||
* Creation of the last EMI-2 [http://www.eu-emi.eu/emi-2-matterhorn/updates/-/asset_publisher/9AgN/content/update-10-02-04-2013-v-2-6-2-1 update 10] | |||
** Ready for production: | |||
*** EMI: WMS 3.4.1, Cream-1.14.3 | |||
*** IGE Gsisshterm 1.3.4, Gram5 5.2.3 and Gridftp 5.2.3; | |||
* Continuing of the activities regarding the UMD-3 [http://www.eu-emi.eu/releases/emi-3-montebianco/products EMI-3] topics : | |||
** Continuing of the UMD-3 staged rollout activities: | |||
*** SR announcements for the following products: Argus (1.6.0); DPM & LFC (1.8.6); WMS (3.5.0); WN (3.0.0); UI (3.0.0); LB (4.0.4). | |||
=SA1.3 Integration= | =SA1.3 Integration= | ||
Line 37: | Line 57: | ||
=SA1.6 Helpdesk= | =SA1.6 Helpdesk= | ||
<!-- G. Grein --> | <!-- G. Grein --> | ||
* Ticket monitoring | |||
* Preparing GGUS April release | |||
* Weekly phone conference for discussing open requests (shopping list) on GGUS | |||
* Preparing relevant meetings at EGI CF in Manchester | |||
=SA1.7 Support= | =SA1.7 Support= | ||
<!-- Trompert --> | <!-- Trompert --> | ||
* followup of new sites with new EMI-1 alarms for software retirement | |||
* follow up of RPI, sites to be suspended, top BDII A/R, Unknowns | |||
* preparation ROD meeting next week at the CF | |||
== Software Support == | == Software Support == | ||
Line 83: | Line 110: | ||
=SA1.8 Availability and core services= | =SA1.8 Availability and core services= | ||
<!-- | <!--P. Korosoglou--> | ||
Nothing new to report | |||
== Documentation == | == Documentation == | ||
<!-- M. Krakowian --> | <!-- M. Krakowian --> |
Latest revision as of 18:23, 6 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Progress of SA1 issues
Nothing new to report.
Milestones/Deliverables
D4.8: Annual assessment of the production infrastructure. Gathering of raw data completed, working towards finalizing text.
SA1.1 Activity Management
MEETINGS
- Federated cloud task force
ACTIVITIES
- Contacted Rob Quick for a presentation about OSG Champions activity (CF2013)
- ops VO management
SA1.2 Security
- Not much because of Easter
- Central Emergency User Suspension
- Preparing for the EGI CF in Manchester
- One new vulnerability reported
- EGI CSIRT Compromised Certificate procedure revised assuming Emergency suspension is in place, including criteria for emergency suspension
SA1.3 Staged rollout
- creation of the release for the last EMI-1 products update 24
- Creation of the last EMI-2 update 10
- Ready for production:
- EMI: WMS 3.4.1, Cream-1.14.3
- IGE Gsisshterm 1.3.4, Gram5 5.2.3 and Gridftp 5.2.3;
- Ready for production:
- Continuing of the activities regarding the UMD-3 EMI-3 topics :
- Continuing of the UMD-3 staged rollout activities:
- SR announcements for the following products: Argus (1.6.0); DPM & LFC (1.8.6); WMS (3.5.0); WN (3.0.0); UI (3.0.0); LB (4.0.4).
- Continuing of the UMD-3 staged rollout activities:
SA1.3 Integration
SA1.4 Central tools
SA1.5 Accounting
Repository
Portal
SA1.6 Helpdesk
- Ticket monitoring
- Preparing GGUS April release
- Weekly phone conference for discussing open requests (shopping list) on GGUS
- Preparing relevant meetings at EGI CF in Manchester
SA1.7 Support
- followup of new sites with new EMI-1 alarms for software retirement
- follow up of RPI, sites to be suspended, top BDII A/R, Unknowns
- preparation ROD meeting next week at the CF
Software Support
Contribution to D5.9 provided. Otherwise nothing special to report
DMSU tickets flow Mar 24-31 | |
---|---|
assigned | 15 |
back to tpm | 0 |
reassigned to 3rd level | 14 |
solved | 4 |
open DMSU tickets status | |
---|---|
assigned | 2 |
in progress | 3 |
waiting for reply | 1 |
on hold | 1 |
Network Support
SA1.8 Availability and core services
Nothing new to report
Documentation
Nothing new to report