Difference between revisions of "EGI-InSPIRE:Sa1 2013-04-02"
Jump to navigation
Jump to search
Line 28: | Line 28: | ||
= SA1.3 Staged rollout = | = SA1.3 Staged rollout = | ||
<!-- J. Pina --> | <!-- J. Pina --> | ||
* creation of the release for the last EMI-1 products [http://www.eu-emi.eu/emi-1-kebnekaise-updates/-/asset_publisher/Ir6q/content/update-24-28-03-2013-v-1-14-2-2 update 24] | |||
* Creation of the last EMI-2 [http://www.eu-emi.eu/emi-2-matterhorn/updates/-/asset_publisher/9AgN/content/update-10-02-04-2013-v-2-6-2-1 update 10] | |||
** Ready for production: | |||
*** EMI: WMS 3.4.1, Cream-1.14.3 | |||
*** IGE Gsisshterm 1.3.4, Gram5 5.2.3 and Gridftp 5.2.3; | |||
* Continuing of the activities regarding the UMD-3 [http://www.eu-emi.eu/releases/emi-3-montebianco/products EMI-3] topics : | |||
** Start of the UMD-3 staged rollout activities: | |||
*** Bdii-site 1.2.0, Bdii-top 3.0.0, UI 3.0.0, VOMS 3.0.0 and DPM 1.8.6. | |||
=SA1.3 Integration= | =SA1.3 Integration= |
Revision as of 16:58, 2 April 2013
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Progress of SA1 issues
Nothing new to report.
Milestones/Deliverables
D4.8: Annual assessment of the production infrastructure. Gathering of raw data completed, working towards finalizing text.
SA1.1 Activity Management
MEETINGS
ACTIVITIES
SA1.2 Security
- Not much because of Easter
- Central Emergency User Suspension
- Preparing for the EGI CF in Manchester
- One new vulnerability reported
- EGI CSIRT Compromised Certificate procedure revised assuming Emergency suspension is in place, including criteria for emergency suspension
SA1.3 Staged rollout
- creation of the release for the last EMI-1 products update 24
- Creation of the last EMI-2 update 10
- Ready for production:
- EMI: WMS 3.4.1, Cream-1.14.3
- IGE Gsisshterm 1.3.4, Gram5 5.2.3 and Gridftp 5.2.3;
- Ready for production:
- Continuing of the activities regarding the UMD-3 EMI-3 topics :
- Start of the UMD-3 staged rollout activities:
- Bdii-site 1.2.0, Bdii-top 3.0.0, UI 3.0.0, VOMS 3.0.0 and DPM 1.8.6.
- Start of the UMD-3 staged rollout activities:
SA1.3 Integration
SA1.4 Central tools
SA1.5 Accounting
Repository
Portal
SA1.6 Helpdesk
SA1.7 Support
Software Support
Contribution to D5.9 provided. Otherwise nothing special to report
DMSU tickets flow Mar 24-31 | |
---|---|
assigned | 15 |
back to tpm | 0 |
reassigned to 3rd level | 14 |
solved | 4 |
open DMSU tickets status | |
---|---|
assigned | 2 |
in progress | 3 |
waiting for reply | 1 |
on hold | 1 |
Network Support
SA1.8 Availability and core services
Documentation
Nothing new to report