Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Sa1 2012-09-11"

From EGIWiki
Jump to navigation Jump to search
Line 1: Line 1:
{{Template:Op menubar}}
{{Template:Op menubar}} {{TOC_right}}  
{{TOC_right}}


SA1 weekly report
SA1 weekly report  


=Progress of SA1 issues=  
=Progress of SA1 issues= <!-- T. Ferrari -->  
<!-- T. Ferrari -->


=Milestones/Deliverables=
=Milestones/Deliverables= <!-- T. Ferrari -->  
<!-- T. Ferrari -->
* MS421: waiting for external reviews to be submitted. Feedback expected on Wed 12/09.


=SA1.1 Activity Management=
*MS421: waiting for external reviews to be submitted. Feedback expected on Wed 12/09.
<!-- S. Burke, T. Ferrari,  M. Krakowian, P. Solagna -->


Meetings: f2f JRA1 meeting in Karlsruhe
=SA1.1 Activity Management= <!-- S. Burke, T. Ferrari, M. Krakowian, P. Solagna -->
* Preparing the information system workshop agenda for the Technical Forum
* review of GLUE 2 EGI profile, discussion of software version publication with WLCG
* assessment of desktop infrastructures being run in production
* Attended the Federated Cloud Task Force Meeting, assessment of the status of the information system
* Chaired EGI Operations Meeting and agenda preparation
* Preparation of the AAI workshop in collaboration with SA2.5
* Final tuning of the middleware track for the TF2012
* Follow up of the currently monitored vulnerabilities
* Follow up of one issue with the accounting system for sites with hybrid middleware (gLite-ARC)


=SA1.2 Security=
Meetings: f2f JRA1 meeting in Karlsruhe
* Run SSC6, security drill using VO-CMS resources, including EGI, WLCG and OSG sites.
* Prepare for TF 2012 (CSIRT meeting and security training)
* SVG - discussion of a new vulnerability


<!-- D. Kelsey -->
*Preparing the information system workshop agenda for the Technical Forum
*review of GLUE 2 EGI profile, discussion of software version publication with WLCG
*assessment of desktop infrastructures being run in production
*Attended the Federated Cloud Task Force Meeting, assessment of the status of the information system
*Chaired EGI Operations Meeting and agenda preparation
*Preparation of the AAI workshop in collaboration with SA2.5
*Final tuning of the middleware track for the TF2012
*Follow up of the currently monitored vulnerabilities
*Follow up of one issue with the accounting system for sites with hybrid middleware (gLite-ARC)


= SA1.3 Staged rollout =
= SA1.2 Security =
*Staged rollout status presented at the Ops meeting.
*Fast preparation and provisioning of UMD2.1.1 containing bug fix of https://ggus.eu/tech/ticket_show.php?ticket=84509
**Release almost ready for announcement: https://wiki.egi.eu/wiki/UMD-2:UMD-2.1.1
*Manual monitoring of the info system for the WMS and CEs
**https://wiki.egi.eu/wiki/WMS_Monitor
**https://wiki.egi.eu/wiki/CE_Monitor
*Staged rollout reports done are now showed in:
**http://www.lip.pt/computing/apps/EGI_EA/index.php?option=1
**Useful to get the metrics for the Quarterly Reports.
<!-- M. David, J. Pina -->


=SA1.3 Integration=
*Run SSC6, security drill using VO-CMS resources, including EGI, WLCG and OSG sites.
<!-- E. Imamagic, M. Krakowian from Nov 2012 -->
*Prepare for TF 2012 (CSIRT meeting and security training)
*SVG - discussion of a new vulnerability
 
<!-- D. Kelsey -->
 
= SA1.3 Staged rollout  =
 
*Staged rollout status presented at the Ops meeting.
*Fast preparation and provisioning of UMD2.1.1 containing bug fix of https://ggus.eu/tech/ticket_show.php?ticket=84509
**Release almost ready for announcement: https://wiki.egi.eu/wiki/UMD-2:UMD-2.1.1
*Manual monitoring of the info system for the WMS and CEs
**https://wiki.egi.eu/wiki/WMS_Monitor
**https://wiki.egi.eu/wiki/CE_Monitor
*Staged rollout reports done are now showed in:
**http://www.lip.pt/computing/apps/EGI_EA/index.php?option=1
**Useful to get the metrics for the Quarterly Reports. <!-- M. David, J. Pina -->
 
=SA1.3 Integration= <!-- E. Imamagic, M. Krakowian from Nov 2012 -->  


*Globus integration task force meeting:  
*Globus integration task force meeting:  
**agenda: https://indico.egi.eu/indico/conferenceDisplay.py?confId=1152 (uploaded minutes)
**agenda: https://indico.egi.eu/indico/conferenceDisplay.py?confId=1152 (uploaded minutes)  
**updated action points on [[Globus integration task force|wiki page]].
**updated action points on [[Globus integration task force|wiki page]].  
*UNICORE integration task force meeting:  
*UNICORE integration task force meeting:  
**agenda: https://indico.egi.eu/indico/conferenceDisplay.py?confId=1151
**agenda: https://indico.egi.eu/indico/conferenceDisplay.py?confId=1151  
**updated action points on [[UNICORE integration task force|wiki page]].
**updated action points on [[UNICORE integration task force|wiki page]].


=SA1.4 Central tools=  
=SA1.4 Central tools= <!--E. Imamagic -->  
<!--E. Imamagic -->


*By the end of Tuesday 13 NGIs have deployed SAM Update-17. There were few issues reported:  
*By the end of Tuesday 13 NGIs have deployed SAM Update-17. There were few issues reported:  
**ARC sites which use VO_FQAN require to add it to configuration file, see [https://tomtools.cern.ch/confluence/display/SAM/SAM+setup+for+ARC+services documentation]
**ARC sites which use VO_FQAN require to add it to configuration file, see [https://tomtools.cern.ch/confluence/display/SAM/SAM+setup+for+ARC+services documentation]  
**UNICORE configuration changes, see [https://tomtools.cern.ch/confluence/display/SAM/SAM+setup+for+UNICORE+services documentation]
**UNICORE configuration changes, see [https://tomtools.cern.ch/confluence/display/SAM/SAM+setup+for+UNICORE+services documentation]  
* Added three new sites for user services to EGI.eu:
*Added three new sites for user services to EGI.eu:  
** GRIDOPS-APPDB (https://goc.egi.eu/portal/index.php?Page_Type=View_Object&object_id=116402&grid_id=0)
**GRIDOPS-APPDB (https://goc.egi.eu/portal/index.php?Page_Type=View_Object&amp;object_id=116402&amp;grid_id=0)  
** GRIDOPS-CRM (https://goc.egi.eu/portal/index.php?Page_Type=View_Object&object_id=116398&grid_id=0)
**GRIDOPS-CRM (https://goc.egi.eu/portal/index.php?Page_Type=View_Object&amp;object_id=116398&amp;grid_id=0)  
** GRIDOPS-TMP (https://goc.egi.eu/portal/index.php?Page_Type=View_Object&object_id=116407&grid_id=0)
**GRIDOPS-TMP (https://goc.egi.eu/portal/index.php?Page_Type=View_Object&amp;object_id=116407&amp;grid_id=0)  
* Preparing survey for deployment of regionalized tool instances.
*Preparing survey for deployment of regionalized tool instances.  
*Agreed to accept Globus tests into Operations Portal starting from October 1st 2012.
*Agreed to accept Globus tests into Operations Portal starting from October 1st 2012.  
* Agreed on final version FedCloud monitoring before the TF demo (https://test30.egi.cesga.es/nagios/):
*Agreed on final version FedCloud monitoring before the TF demo (https://test30.egi.cesga.es/nagios/):  
** Accounting probe should raise error in case when accounting is missing completely, stale records should return OK
**Accounting probe should raise error in case when accounting is missing completely, stale records should return OK  
** Waiting for new version of OpenStack-compatible OCCI probe for OpenStack based RPs
**Waiting for new version of OpenStack-compatible OCCI probe for OpenStack based RPs
 
=SA1.5 Accounting= <!--J. Gordon-->
 
*Deployed test consumers and databases for XML versions of CAR and StAR.
*Participated in unicore and globus interoperations meetings.
*Reinvigorated testing of SSM publishing from Italy, SGAS (SWITCH and Finland), and MAPPER.
*SWITCH publishing their SGAS to APEL has highlighted an issue with sites publishing by multiple routes. One site runs and ARC CE published via SGAS and a CREAM CE published via apel client. Solution will appear but need a temporary workaround.
 
=SA1.6 Helpdesk= <!-- T. Antoni --> Kickoff of GGUS advisory group
 
= SA1.7 Support =
 
== grid oversight  ==
 
*COD phone conf
*Ticket handling
*preparations for TF12
 
== network support  ==


=SA1.5 Accounting=
I have further proceeded in the IPv6 testing of DPM server and already published a first part of the outcome on the report section of the wiki on
<!--J. Gordon-->
* Deployed test consumers and databases for XML versions of CAR and StAR.
* Participated in unicore and globus interoperations meetings.
* Reinvigorated testing of SSM publishing from Italy, SGAS (SWITCH and Finland), and MAPPER.
* SWITCH publishing their SGAS to APEL has highlighted an issue with sites publishing by multiple routes. One site runs and ARC CE published via SGAS and a CREAM CE published via apel client. Solution will appear but need a temporary workaround.


=SA1.6 Helpdesk=
https://wiki.egi.eu/wiki/IPv6TestReportGliteDPM
<!-- T. Antoni -->
Kickoff of GGUS advisory group


=SA1.7 Support=
I also have started installing and configuring both WMS server and LFC file catalogue
== grid oversight ==
* COD phone conf
* Ticket handling
* preparations for TF12


== network support ==
I just started as well to test CREAM CE and report on https://wiki.egi.eu/wiki/IPv6TestReportGliteCreamCE
I have further proceeded in the IPv6 testing of DPM server and already published a first part of the outcome on the report section of the wiki on


https://wiki.egi.eu/wiki/IPv6TestReportGliteDPM
== software support == <!-- A Krenek -->


I also have started installing and configuring both WMS server and LFC file catalogue
= SA1.8 Availability and core services= <!--C. Kanellopoulos-->


I just started as well to test CREAM CE and report on https://wiki.egi.eu/wiki/IPv6TestReportGliteCreamCE
* Reviewed comments received for EGI OLA
* Published the EGI Availability and Reliability Reports for August 2012


== software support ==
== Documentation == <!-- M. Krakowian -->  
<!-- A Krenek -->


=SA1.8 Availability and core services=
*review of site certification procedure to meet requirements from UNICORE and GLOBUS
<!--C. Kanellopoulos-->
*review of draft procedure for site renaming
*extension of MAN01 for publication of GLUE 2 information into site BDII (work in progress)
*review of VO registration procedure, taking into account EGI CSIRT input


== Documentation ==
= Meetings =
<!-- M. Krakowian -->
* review of site certification procedure to meet requirements from UNICORE and GLOBUS
* review of draft procedure for site renaming
* extension of MAN01 for publication of GLUE 2 information into site BDII (work in progress)
* review of VO registration procedure, taking into account EGI CSIRT input


= Meetings=
<!--all-->
<!--all-->

Revision as of 22:33, 11 September 2012

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



SA1 weekly report

Progress of SA1 issues

Milestones/Deliverables

  • MS421: waiting for external reviews to be submitted. Feedback expected on Wed 12/09.

SA1.1 Activity Management

Meetings: f2f JRA1 meeting in Karlsruhe

  • Preparing the information system workshop agenda for the Technical Forum
  • review of GLUE 2 EGI profile, discussion of software version publication with WLCG
  • assessment of desktop infrastructures being run in production
  • Attended the Federated Cloud Task Force Meeting, assessment of the status of the information system
  • Chaired EGI Operations Meeting and agenda preparation
  • Preparation of the AAI workshop in collaboration with SA2.5
  • Final tuning of the middleware track for the TF2012
  • Follow up of the currently monitored vulnerabilities
  • Follow up of one issue with the accounting system for sites with hybrid middleware (gLite-ARC)

SA1.2 Security

  • Run SSC6, security drill using VO-CMS resources, including EGI, WLCG and OSG sites.
  • Prepare for TF 2012 (CSIRT meeting and security training)
  • SVG - discussion of a new vulnerability


SA1.3 Staged rollout

SA1.3 Integration

SA1.4 Central tools

SA1.5 Accounting

  • Deployed test consumers and databases for XML versions of CAR and StAR.
  • Participated in unicore and globus interoperations meetings.
  • Reinvigorated testing of SSM publishing from Italy, SGAS (SWITCH and Finland), and MAPPER.
  • SWITCH publishing their SGAS to APEL has highlighted an issue with sites publishing by multiple routes. One site runs and ARC CE published via SGAS and a CREAM CE published via apel client. Solution will appear but need a temporary workaround.

=SA1.6 Helpdesk= Kickoff of GGUS advisory group

SA1.7 Support

grid oversight

  • COD phone conf
  • Ticket handling
  • preparations for TF12

network support

I have further proceeded in the IPv6 testing of DPM server and already published a first part of the outcome on the report section of the wiki on

https://wiki.egi.eu/wiki/IPv6TestReportGliteDPM

I also have started installing and configuring both WMS server and LFC file catalogue

I just started as well to test CREAM CE and report on https://wiki.egi.eu/wiki/IPv6TestReportGliteCreamCE

software support

SA1.8 Availability and core services

  • Reviewed comments received for EGI OLA
  • Published the EGI Availability and Reliability Reports for August 2012

Documentation

  • review of site certification procedure to meet requirements from UNICORE and GLOBUS
  • review of draft procedure for site renaming
  • extension of MAN01 for publication of GLUE 2 information into site BDII (work in progress)
  • review of VO registration procedure, taking into account EGI CSIRT input

Meetings