Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Sa1 2012-09-04"

From EGIWiki
Jump to navigation Jump to search
Line 57: Line 57:


== Network and IPv6  ==
== Network and IPv6  ==
Network Support has been working on the set up of the IPv6 testbed.
site BDII,  DPM node, CREAM CE, WN, UI, Top BDII  have been installed at the Roma GARR site and a new IPv6 devoted site GARR-IPV6-DIR has been set up.
A customized version of site-info.def for a global IPv6 testbed has been created and will be circulated to EMI, EGI and HEPiX IPv6 teams.
Wiki has been updated on https://wiki.egi.eu/wiki/IPv6 New VMware server has been set up at GARR, capable of tens of VMs, devoted to IPv6 and Network SUpport.  (wn05.dir.garr.it) Machines have been registered in DNS with an IPv6-testing convenction .
Initial reports of first outcomes are being prepared.
Serious issues with LRMS/batch systems have been encountered with Torque/PBS.


== COD  ==
== COD  ==

Revision as of 14:57, 4 September 2012

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



SA1 weekly report

Progress of SA1 issues

Milestones/Deliverables

  • MS421 Report of integration activities: started external review
  • D4.6 collecting material for the new ToC discussed
  • D4.7 Sustainability assessment of operational services --> waiting for output of the NGI survey closing on 07 Sep

SA1.1 Activity Management

  • Meetings: WLCG MB, WLCG/EGI meeting on mw support schedules, EGI/WLCG/EMI meeting on WLCG repository requirements
  • Preparing the information system workshop agenda for the Technical Forum
  • review of GLUE 2 EGI profile, discussion of software version publication with WLCG
  • review of status of security advisories, finalization of UMD 1.8.1 release notes and announcement
  • discussion of WN/UI/DPM/LFC support calendar
  • Review of Milestone MS421
  • followup of problems related with the release notes of UMD 1.8.1

SA1.2 Security

  • Preparation of training sessions at TF12
  • preparation for the September IGTF meeting

SA1.3 Staged rollout

SA1.3 Integration

SA1.4 Central tools

  • By the end of Tuesday 6 NGIs have deployed SAM Update-17. There were few issues reported:
    • package perl-Directory-Queue was not synchronized between SAM and EGI repository, warning about the error was added to release notes
    • problem was found in SQL scripts provided in manual steps, updated script was promptly provided.
  • Meeting regarding monitoring of brokers was held on Thursday. Details can be found here: https://indico.egi.eu/indico/conferenceDisplay.py?confId=1150.
  • GOCDB database updates were performed on August 30th from 8:00 to 14:00 (UTC). During that time GOCDB was set to read-only mode. The PI was available.

SA1.5 Accounting

SA1.6 Helpdesk

SA1.7 Support

Software Support

Network and IPv6

Network Support has been working on the set up of the IPv6 testbed. site BDII, DPM node, CREAM CE, WN, UI, Top BDII have been installed at the Roma GARR site and a new IPv6 devoted site GARR-IPV6-DIR has been set up. A customized version of site-info.def for a global IPv6 testbed has been created and will be circulated to EMI, EGI and HEPiX IPv6 teams.

Wiki has been updated on https://wiki.egi.eu/wiki/IPv6 New VMware server has been set up at GARR, capable of tens of VMs, devoted to IPv6 and Network SUpport. (wn05.dir.garr.it) Machines have been registered in DNS with an IPv6-testing convenction .

Initial reports of first outcomes are being prepared. Serious issues with LRMS/batch systems have been encountered with Torque/PBS.

COD

  • preparations for TF12
  • Grid Oversight business as usual

SA1.8 Availability and core services

  • collection, validation and distribution of top-BDII statistics for August 2012
  • creation of registration authorities for the BGI participants
  • DTEAM VO Management tasks

== Documentation == Update of documentation mailing list, review of current wiki operations documentation pages

Meetings

  • JRA1 face to face meeting , Karlsruhe, 5-6 2012
  • ENVRI meeting, 11-13 Sep, Edinburgh
  • EUDAT conference, Barcelona, Oct