Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:SA1 Quality Metrics"

From EGIWiki
Jump to navigation Jump to search
Line 2: Line 2:


{| border="1" cellspacing="0" cellpadding="5" align="center"
{| border="1" cellspacing="0" cellpadding="5" align="center"
! Metric ID, Description
! style="width: 25%" | Metric ID, Description
! Comment
! style="width: 10%" |Comment
! QR1
! QR1
! QR2
! QR2

Revision as of 12:17, 10 December 2010

Note: P=Public, I=Internal

Metric ID, Description Comment QR1 QR2 QR3
M.SA1.Usage.1, Number of jobs done, per VO and discipline (mean daily/monthly number) - P Tool: accounting portal
M.SA1.Usage.2, Normalised consumed computing capacity - P Measured in HEP SPEC. Tool: accounting portal
M.SA1.Usage.3, Normalised Computing power consumed outside of a user’s home country - P Requires tool development
M.SA1.Size.1, Total number of production resource centers that are part of the EGI - P TSA1.1, Tool: gstat. TSA1.1 QR
M.SA1.Size.2, Total number of job slots available in EGI per NGI - P TSA1.1, Tool: gstat. NGI can amend results reported by tools, and report correct values in its own QR
M.SA1.Size.3, Installed Capacity in HEP SPEC in EGI per NGI - P TSA1.1, Tool: gstat. NGI can amend results reported by tools, and report correct values in its own QR
M.SA1.Size.4, Installed Disk Capacity (PB) per NGI - P TSA1.1, Tool: gstat. NGI can amend results reported by tools, and report correct values in its own QR
M.SA1.Size.5, Installed Tape Capacity (PB) per NGI - P TSA1.1, Tool: gstat. NGI can amend results reported by tools, and report correct values in its own QR
M.SA1.OperationalSecurity.1, Number of Site Security challenge (SSC) made - I TSA1.2, Manual metric (from TSA1.2 QR)
M.SA1.OperationalSecurity.2, Number of Sites passing one Security Challenge - I TSA1.2, Target: 50% (to be reviewed in the coming months). Manual metric (from TSA1.2 QR)
M.SA1.OperationalSecurity.3, Number of suspended sites for security issues - I TSA1.2, Manual metric (in TSA1.2 QR)
M.SA1.Integration.1, Number of production HPC clusters per NGI - I TSA1.3, HPC clusters is a site with a dedicated high-speed low-latency communications network. Manual metric (NGI QR)
M.SA1.Integration.2, Number of production sites supporting MPI - I TSA1.3, Passing MPI Nagios tests. Tool: query to the information system Manual metric (NGI QR)
M.SA1.Integration.3, Amount of integrated desktop resources - I TSA1.3, Placeholder: Need to define desktop resources and how to integrate them. Manual metric (NGI QR)
M.SA1.Integration.4, Amount of virtualised installed capacity accessible to EGI users - I TSA1.3, Placeholder: Need to define virtualised resources and how to integrate them. Manual metric (NGI QR)
M.SA1.ServiceValidation.1, Total number of staged rollout components operated per NGI - I TSA1.3, Record the number of components participating in each release of a component. Manual metric (TSA1.3 QR)
M.SA1.ServiceValidation.2, Number of staged rollout releases undertaken & rejected - I TSA1.3, Manual metric (TSA1.3 QR)
M.SA1.Accounting.1, Number of sites adopting AMQ messaging for Usage Record publication - P TSA1.5, Manual metric (TSA1.5 QR)
M.SA1.Support.1, Number of operational tickets (operational and user) CREATED /SOLVED per Support Unit per month - P TSA1.7, Tool: GGUS reporting tool
M.SA1.Support.2, Average/Median Solution Time ticket solution time (business days) per Support Unit per month - P TSA1.7, Tool: GGUS reporting tool
M.SA1.Support.3, Number of monthly tickets opened per NGI - P TSA1.7, Tool: GGUS reporting tool
M.SA1.Support.4, Assigned ticket Average/Median RESPONSE TIME/SOLUTION TIME per Support Unit per month - P TSA1.7, Tool: GGUS reporting tool
M.SA1.Support.5, Number of tickets SOLVED by TPM (1st line support) - I TSA1.7, Tool: GGUS reporting tool
M.SA1.Support.6, Ticket assignment time to Support Units by TPM (1st line support) - I TSA1.7, Tool: operations dashboard
M.SA1.Support.7,COD Workload per month - I TSA1.7, Tool: operations dashboard. TSA1.7 report
M.SA1.Support.8, ROD Workload per month per region/NGI - I TSA1.7, Tool: operations dashboard. TSA1.7 report
MSA1.Support.9, ROD Quality Metrics per month per region/NGI - I TSA1.7, Tool: operations dashboard. TSA1.7 report
M.SA1.Operation.1, NGI monthly availability and reliability - P TSA1.8, Tool: availability report generator
M.SA1.Operation.2, Number of sites suspended - I TSA1.7, Manual metric. TSA1.7 report
M.SA1.Operation.3, NGI monthly availability and reliability of core operations tools - P TSA1.8, Development needed
M.SA1.Operation.4, NGI Monthly availability and reliability of core middleware services - P TSA1.8, Development needed
M.SA1.Operation.5, EGI monthly availability and reliability of core middleware services - P TSA1.8, Development needed
M.SA1.Operation.6, EGI monthly availability and reliability of central operations tools - P TSA1.8, Development needed