Difference between revisions of "EGI-InSPIRE:SA1.8-QR8"

From EGIWiki
Jump to: navigation, search
(2. Main Achievements)
(2. Main Achievements)
Line 31: Line 31:
 
* The RP OLA was updated to v1.1. [[ https://wiki.egi.eu/wiki/Resource_infrastructure_Provider_OLA:_Release_Notes#Release_notes_v._1.1 | Changes ]] were approved at [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)]  
 
* The RP OLA was updated to v1.1. [[ https://wiki.egi.eu/wiki/Resource_infrastructure_Provider_OLA:_Release_Notes#Release_notes_v._1.1 | Changes ]] were approved at [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)]  
  
* The 1st draft of [https://documents.egi.eu/document/1093 EGI.eu OLA] has been written.
+
* A draft version of [https://documents.egi.eu/document/1093 EGI.eu OLA] has been published.
  
 
* Assessment of the EGI.eu central tools service level targets.<br>The availability metrics for individual tool instances were extracted from the [https://ops-monitor.cern.ch/nagios/ Nagios] and [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=1&materialId=slides&confId=719 presented] at the [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)].<br>The OMB agreed to the [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=0&materialId=slides&confId=719 proposed] service level targets.
 
* Assessment of the EGI.eu central tools service level targets.<br>The availability metrics for individual tool instances were extracted from the [https://ops-monitor.cern.ch/nagios/ Nagios] and [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=1&materialId=slides&confId=719 presented] at the [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)].<br>The OMB agreed to the [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=0&materialId=slides&confId=719 proposed] service level targets.
  
* The ROC_CRITICAL profile replaced the previously used WLCG_CREAM_LCGCE_CRITICAL, starting with the A/R reports of January 2012.
+
* A draft version of [https://documents.egi.eu/document/1057 MS418] "Operational Level Agreements (OLAs) within the EGI production infrastructure" has been published.
  
* As of January 2012, it is mandatory that top-BDII services operated by NGIs provide a minimum availability of 99%.
+
== EGI Catch-All Core Service ==
 +
 
 +
* Operation of WMS, LB and Top-BDII for site certification
 +
 
 +
* Operation of certification Catch-All portal
  
* ...
+
=== dteam VO ===
  
== EGI Catch-All Core Service ==
+
* Operation of VOMS/VORMS for dteam VO.
 +
 
 +
* New dteam/EGI group has been created. The dteam [http://operations-portal.egi.eu/vo/downloadAUP/file/dteam-AcceptableUsePolicy-20110926-1316993681969.txt Acceptable Use Policy] had to change slightly to allow this.
 +
 
 +
* New dteam/NGI_UA (Ukraine) has been created.
 +
 
 +
* Add the new "UK e-Science CA 2B" certificate to all the dteam VO members which had the old "UK e-Science CA" [https://ggus.eu/ws/ticket_info.php?ticket=78909].
  
 
= 3. Issues and Mitigation =
 
= 3. Issues and Mitigation =

Revision as of 10:37, 2 May 2012

1. Task Meetings

Date (dd/mm/yyyy) Url Indico Agenda Title Outcome

2. Main Achievements

  • Continue publishing of A/R league tables - OPS
  • Continue publishing of A/R reports for NGI Core services (top-BDII)
  • Assessment of the EGI.eu central tools service level targets.
    The availability metrics for individual tool instances were extracted from the Nagios and presented at the OMB (2012-02-28).
    The OMB agreed to the proposed service level targets.
  • A draft version of MS418 "Operational Level Agreements (OLAs) within the EGI production infrastructure" has been published.

EGI Catch-All Core Service

  • Operation of WMS, LB and Top-BDII for site certification
  • Operation of certification Catch-All portal

dteam VO

  • Operation of VOMS/VORMS for dteam VO.
  • New dteam/EGI group has been created. The dteam Acceptable Use Policy had to change slightly to allow this.
  • New dteam/NGI_UA (Ukraine) has been created.
  • Add the new "UK e-Science CA 2B" certificate to all the dteam VO members which had the old "UK e-Science CA" [1].

3. Issues and Mitigation

Issue Description Mitigation Description

4. Plans for the next period

  • ...
  • Continue the handling the validation and distribution of the monthly A/R reports and the maintenance of the relevant wiki page