Difference between revisions of "EGI-InSPIRE:SA1.8-QR8"

From EGIWiki
Jump to: navigation, search
(2. Main Achievements)
Line 35: Line 35:
 
* Assessment of the EGI.eu central tools service level targets.<br>The availability metrics for individual tool instances were extracted from the [https://ops-monitor.cern.ch/nagios/ Nagios] and [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=1&materialId=slides&confId=719 presented] at the [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)].<br>The OMB agreed to the [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=0&materialId=slides&confId=719 proposed] service level targets.
 
* Assessment of the EGI.eu central tools service level targets.<br>The availability metrics for individual tool instances were extracted from the [https://ops-monitor.cern.ch/nagios/ Nagios] and [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=1&materialId=slides&confId=719 presented] at the [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)].<br>The OMB agreed to the [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=0&materialId=slides&confId=719 proposed] service level targets.
  
* The new ROC_CRITICAL profile replaced the previously used WLCG_CREAM_LCGCE_CRITICAL, starting with the A/R reports of January 2012.
+
* The ROC_CRITICAL profile replaced the previously used WLCG_CREAM_LCGCE_CRITICAL, starting with the A/R reports of January 2012.
 +
 
 +
* As of January 2012, it is mandatory that top-BDII services operated by NGIs provide a minimum availability of 99%.
  
 
* ...
 
* ...

Revision as of 14:51, 30 April 2012

1. Task Meetings

Date (dd/mm/yyyy) Url Indico Agenda Title Outcome

2. Main Achievements

  • Continue publishing of A/R league tables - OPS
  • Continue publishing of A/R reports for NGI Core services (top-BDII)
  • Assessment of the EGI.eu central tools service level targets.
    The availability metrics for individual tool instances were extracted from the Nagios and presented at the OMB (2012-02-28).
    The OMB agreed to the proposed service level targets.
  • The ROC_CRITICAL profile replaced the previously used WLCG_CREAM_LCGCE_CRITICAL, starting with the A/R reports of January 2012.
  • As of January 2012, it is mandatory that top-BDII services operated by NGIs provide a minimum availability of 99%.
  • ...

EGI Catch-All Core Service

3. Issues and Mitigation

Issue Description Mitigation Description

4. Plans for the next period

  • ...
  • Continue the handling the validation and distribution of the monthly A/R reports and the maintenance of the relevant wiki page