Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:SA1.8-QR8"

From EGIWiki
Jump to navigation Jump to search
Line 34: Line 34:


* Assessment of the EGI.eu central tools service level targets.<br>The availability metrics for individual tool instances were extracted from the [https://ops-monitor.cern.ch/nagios/ Nagios] and [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=1&materialId=slides&confId=719 presented] at the [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)].<br>The OMB agreed to the [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=0&materialId=slides&confId=719 proposed] service level targets.
* Assessment of the EGI.eu central tools service level targets.<br>The availability metrics for individual tool instances were extracted from the [https://ops-monitor.cern.ch/nagios/ Nagios] and [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=1&materialId=slides&confId=719 presented] at the [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)].<br>The OMB agreed to the [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=0&materialId=slides&confId=719 proposed] service level targets.
* The new ROC_CRITICAL profile replaced the previously used WLCG_CREAM_LCGCE_CRITICAL, starting with the A/R reports of January 2012.


* ...
* ...
Line 54: Line 56:
= 4. Plans for the next period =
= 4. Plans for the next period =
<!-- provide your text below -->
<!-- provide your text below -->
* ...
* Continue the handling the validation and distribution of the monthly A/R reports and the maintenance of the relevant wiki page

Revision as of 15:44, 30 April 2012

1. Task Meetings

Date (dd/mm/yyyy) Url Indico Agenda Title Outcome

2. Main Achievements

  • Continue publishing of A/R league tables - OPS
  • Continue publishing of A/R reports for NGI Core services (top-BDII)
  • Assessment of the EGI.eu central tools service level targets.
    The availability metrics for individual tool instances were extracted from the Nagios and presented at the OMB (2012-02-28).
    The OMB agreed to the proposed service level targets.
  • The new ROC_CRITICAL profile replaced the previously used WLCG_CREAM_LCGCE_CRITICAL, starting with the A/R reports of January 2012.
  • ...

EGI Catch-All Core Service

3. Issues and Mitigation

Issue Description Mitigation Description

4. Plans for the next period

  • ...
  • Continue the handling the validation and distribution of the monthly A/R reports and the maintenance of the relevant wiki page