Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:SA1.8-QR8"

From EGIWiki
Jump to navigation Jump to search
Line 22: Line 22:
Note. This is a detailed account of progress over the previous quarter of activities within  the  task.  
Note. This is a detailed account of progress over the previous quarter of activities within  the  task.  
-->
-->
* Continue publishing of A/R league tables - OPS
* Continue publishing of A/R reports for NGI Core services (top-BDII)
* The RC OLA was updated to v1.1. [[ https://wiki.egi.eu/wiki/Resource_Centre_OLA:_Release_Notes#Resource_Centre_OLA_v._1.1 | Changes ]] were approved at [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)]
* The RP OLA was updated to v1.1. [[ https://wiki.egi.eu/wiki/Resource_infrastructure_Provider_OLA:_Release_Notes#Release_notes_v._1.1 | Changes ]] were approved at [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)]
* The 1st draft of [https://documents.egi.eu/document/1093 EGI.eu OLA] has been written.
* Assessment of the EGI.eu central tools service level targets.<br>The availability metrics for individual tool instances were extracted from the [https://ops-monitor.cern.ch/nagios/ Nagios] and [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=1&materialId=slides&confId=719 presented] at the [https://www.egi.eu/indico/conferenceDisplay.py?confId=719 OMB (2012-02-28)].<br>The OMB agreed to the [https://www.egi.eu/indico/getFile.py/access?contribId=7&resId=0&materialId=slides&confId=719 proposed] service level targets.
* ...


== EGI Catch-All Core Service ==
== EGI Catch-All Core Service ==

Revision as of 14:53, 30 April 2012

1. Task Meetings

Date (dd/mm/yyyy) Url Indico Agenda Title Outcome

2. Main Achievements

  • Continue publishing of A/R league tables - OPS
  • Continue publishing of A/R reports for NGI Core services (top-BDII)
  • Assessment of the EGI.eu central tools service level targets.
    The availability metrics for individual tool instances were extracted from the Nagios and presented at the OMB (2012-02-28).
    The OMB agreed to the proposed service level targets.
  • ...

EGI Catch-All Core Service

3. Issues and Mitigation

Issue Description Mitigation Description

4. Plans for the next period