Difference between revisions of "EGI-InSPIRE:SA1.8-QR6"
Jump to navigation
Jump to search
Line 30: | Line 30: | ||
*EGI sites availability recalculation procedure was finalized | *EGI sites availability recalculation procedure was finalized | ||
*Service Level Management Support Unit was created in GGUS and wil be used for availability/reliability issues | *Service Level Management Support Unit was created in GGUS and wil be used for availability/reliability issues | ||
==== EGI Catch-All CA ==== | |||
The EGI Catch All CA is servicing 5 countries which do not have a national accredited Certification Authority. These countries are Albania, Azerbaijan, Bosnia and Herzegovina, Georgia and Senegal. In addition a Registration Authority has been established at SixSq, a company located in Switzerland and affiliated with the StratusLab project. | |||
= 3. Issues and Mitigation = | = 3. Issues and Mitigation = |
Revision as of 09:25, 1 November 2011
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
5/8/2011 | https://www.egi.eu/indico/conferenceDisplay.py?confId=561 | 5th OLA Task Force meeting | Further evolution of the RP OLA and the VO SLA |
2. Main Achievements
- The RP OLA document has been produced and discussed in the EGI Technical Forum in Lyon.
- The VO SLA document was also produced
- First NGI Core service reports were generated in October 2011 for the TopBDII service using the MyEGI programmatic interface
- EGI sites availability recalculation procedure was finalized
- Service Level Management Support Unit was created in GGUS and wil be used for availability/reliability issues
EGI Catch-All CA
The EGI Catch All CA is servicing 5 countries which do not have a national accredited Certification Authority. These countries are Albania, Azerbaijan, Bosnia and Herzegovina, Georgia and Senegal. In addition a Registration Authority has been established at SixSq, a company located in Switzerland and affiliated with the StratusLab project.
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
The Virtual Site concept for Core services is not easy to implement | In case of the Top BDII MyEGI programmatic interace was used together with a special spreadsheet for the calculation |
4. Plans for the next period
- Work will start on the EGI.eu OLA
- Possibilities to obtain availability/reliability for more Core services will be explored
- The availability profile used for EGI sites will need to be separated from WLCG sites.
5. Number of sites suspended
Month | Suspended sites |
---|---|
July 2011 | 2 |
August 2011 | 0 |
September 2011 | 2 |