Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:SA1.8-QR6"

From EGIWiki
Jump to navigation Jump to search
Line 23: Line 23:
= 2. Main Achievements  =
= 2. Main Achievements  =


<br>
*The RP OLA document has been produced and discussed in the EGI Technical Forum in Lyon.
*The VO SLA document was also produced
*First NGI Core service reports were generated in October 2011 for the TopBDII service using the MyEGI programmatic interface
*EGI sites availability recalculation procedure was finalized
*Service Level Management Support Unit was created in GGUS and wil be used for availability/reliability issues


= 3. Issues and Mitigation  =
= 3. Issues and Mitigation  =

Revision as of 10:09, 31 October 2011


1. Task Meetings

Date (dd/mm/yyyy) Url Indico Agenda Title Outcome
5/8/2011 https://www.egi.eu/indico/conferenceDisplay.py?confId=561 5th OLA Task Force meeting Further evolution of the RP OLA and the VO SLA

2. Main Achievements


  • The RP OLA document has been produced and discussed in the EGI Technical Forum in Lyon.
  • The VO SLA document was also produced
  • First NGI Core service reports were generated in October 2011 for the TopBDII service using the MyEGI programmatic interface
  • EGI sites availability recalculation procedure was finalized
  • Service Level Management Support Unit was created in GGUS and wil be used for availability/reliability issues

3. Issues and Mitigation

Issue Description Mitigation Description

4. Plans for the next period

5. Number of sites suspended

Month Suspended sites
July 2011 2
August 2011 0
September 2011 2