Line 35: | Line 35: | ||
| Explanations are provided that the terminology comes from Operations Architecture document and not the OLA itself | | Explanations are provided that the terminology comes from Operations Architecture document and not the OLA itself | ||
|- | |- | ||
| French NGI reinstated the issue about retrospective availability calculations in the reports for non certified sites | | French NGI reinstated the long standing issue about retrospective availability calculations in the reports for non certified sites | ||
| This issue has been reported numerous time to tools developers, but it will have to wait for the production launch of ACE to be looked into | | This issue has been reported numerous time to tools developers, but it will have to wait for the production launch of ACE to be looked into | ||
|- | |- |
Revision as of 11:21, 27 April 2011
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
05/04/2011 | https://www.egi.eu/indico/conferenceDisplay.py?confId=449 | 3rd OLA Task Force meeting | Recent RC OLA updates, and RIP OLA content |
2. Main Achievements
Based on the discussions about automating the generation of tickets with availability reports that may require corrections, ticket #1084[1] was crated to JRA1.
An updated OLA document adapting the Operations Architecture terminology has been circulated to the OMB and reviewed by NGIs, the review is avaialble at ticket #1526 [2].
Impact of increasing the suspension threshold from 50% Availability for 3 consecutive months to 70% has been evaluated and presented in the OMB at the User forum in Vilnius [3]. The impact has been found to be minimal.
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
NGIs expressed concerns about the new terminology used in OLA documents | Explanations are provided that the terminology comes from Operations Architecture document and not the OLA itself |
French NGI reinstated the long standing issue about retrospective availability calculations in the reports for non certified sites | This issue has been reported numerous time to tools developers, but it will have to wait for the production launch of ACE to be looked into |
4. Plans for the next period
Continue work on the EGI-NGI and Core Services OLA.
Start enforcing of increased Availability/Reliability thresholds from May 2011 (PY2) onwards.
5. Number of sites suspended
Month | Suspended sites |
---|---|
January 2011 | 2 |
February 2011 | 0 |
March 2011 | 0 |