Difference between revisions of "EGI-InSPIRE:SA1.8-QR4"

From EGIWiki
Jump to navigation Jump to search
Line 31: Line 31:
!scope="col"| Issue Description
!scope="col"| Issue Description
!scope="col"| Mitigation Description
!scope="col"| Mitigation Description
|-
| NGIs expressed concerns about the new terminology used in OLA documents
| Explanations are provided that the terminology comes from Operations Architecture document and not the OLA itself
|-
| French NGI reinstated the issue about retrospective availability calculations in the reports for non certified sites
| This issue has been reported numerous time to tools developers, but it will have to wait for the production launch of ACE to be looked into
|-
|-
|}
|}

Revision as of 11:20, 27 April 2011

1. Task Meetings

Date (dd/mm/yyyy) Url Indico Agenda Title Outcome
05/04/2011 https://www.egi.eu/indico/conferenceDisplay.py?confId=449 3rd OLA Task Force meeting Recent RC OLA updates, and RIP OLA content

2. Main Achievements

Based on the discussions about automating the generation of tickets with availability reports that may require corrections, ticket #1084[1] was crated to JRA1.

An updated OLA document adapting the Operations Architecture terminology has been circulated to the OMB and reviewed by NGIs, the review is avaialble at ticket #1526 [2].

Impact of increasing the suspension threshold from 50% Availability for 3 consecutive months to 70% has been evaluated and presented in the OMB at the User forum in Vilnius [3]. The impact has been found to be minimal.

3. Issues and Mitigation

Issue Description Mitigation Description
NGIs expressed concerns about the new terminology used in OLA documents Explanations are provided that the terminology comes from Operations Architecture document and not the OLA itself
French NGI reinstated the issue about retrospective availability calculations in the reports for non certified sites This issue has been reported numerous time to tools developers, but it will have to wait for the production launch of ACE to be looked into

4. Plans for the next period

Continue work on the EGI-NGI and Core Services OLA.

Start enforcing of increased Availability/Reliability thresholds from May 2011 (PY2) onwards.

5. Number of sites suspended

Month Suspended sites
January 2011 2
February 2011 0
March 2011 0