Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:SA1.8-QR4"

From EGIWiki
Jump to navigation Jump to search
Line 10: Line 10:
! style="width: 25%" | Outcome
! style="width: 25%" | Outcome
|-
|-
| 5 April
| https://www.egi.eu/indico/conferenceDisplay.py?confId=449
| 3rd OLA Task Force meeting
| Recent RC OLA updates, and RIP OLA content
|-
|}
|}
= 2. Main Achievements =
= 2. Main Achievements =
Based on the discussions about automating the generation of tickets with availability reports that may require corrections, ticket #1084[https://rt.egi.eu/rt/Ticket/Display.html?id=1084] was crated to JRA1.
Based on the discussions about automating the generation of tickets with availability reports that may require corrections, ticket #1084[https://rt.egi.eu/rt/Ticket/Display.html?id=1084] was crated to JRA1.

Revision as of 11:01, 27 April 2011

1. Task Meetings

Date (dd/mm/yyyy) Url Indico Agenda Title Outcome
5 April https://www.egi.eu/indico/conferenceDisplay.py?confId=449 3rd OLA Task Force meeting Recent RC OLA updates, and RIP OLA content

2. Main Achievements

Based on the discussions about automating the generation of tickets with availability reports that may require corrections, ticket #1084[1] was crated to JRA1.

An updated OLA document adapting the Operations Architecture terminology has been circulated to the OMB and reviewed by NGIs, the review is avaialble at ticket #1526 [2].

Impact of increasing the suspension threshold from 50% Availability for 3 consecutive months to 70% has been evaluated and presented in the OMB at the User forum in Vilnius [3]. The impact has been found to be minimal.

3. Issues and Mitigation

Issue Description Mitigation Description

4. Plans for the next period

Continue work on the EGI-NGI and Core Services OLA.

Start enforcing of increased Availability/Reliability thresholds from May 2011 (PY2) onwards.

5. Number of sites suspended

Month Suspended sites
January 2011 2
February 2011 0
March 2011 0