Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:SA1.6-QR8"

From EGIWiki
Jump to navigation Jump to search
 
(No difference)

Latest revision as of 18:08, 6 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



1. Task Meetings

Date (dd/mm/yyyy) Url Indico Agenda Title Outcome
weekly (phone): Participants Maria Dimou, Helmut Dres, Guenter Grein https://www.egi.eu/indico/categoryDisplay.py?categId=27 "shopping list" meeting traceable at: https://savannah.cern.ch/projects/esc/
need driven no INDICO URL one on one meetings with NGI interface developers testing the interfaces, resolving interface issues
need driven no INDICO URL meetings with EGI-SA2 /EMI /IGE definition of the technology support workflows and their implementation

2. Main Achievements

Report Generator

A prototype was presented at the EGI community forum in March 2012.

GGUS structure

Support units

A couple of new support units have been introduced during the last quarter. They are

  • NGI_UA
  • 3rd level EMI Support unit -- caNL
  • 3rd level EMI Support unit -- EMIR
  • EMI support unit for WNodes

Support units renamed in the last quarter are

  • 'GridView/Availabilities' SU/FE to just 'GridView'

VOs

VOs “snoplus.snolab.ca ” and "vo.cta.in2p3.fr " were added to the list of VOs which provide support via GGUS.
Renamed VO "mice.gridpp.ac.uk" to "mice".

GGUS web interface

  • Added new fields to track which middleware product is affected
  • Updated the info section with new "did you knows?"

GGUS system

  • Update Remedy to 764SP2
  • Auto-switching between Web Front-ends
  • Splitting crls-sources

3. Issues and Mitigation

Issue Description Mitigation Description
Collaboration of GGUS with CSIRT Assessment of adaption of GGUS access model to meet the needs of CSIRT. This discussion is still ongoing.

4. Plans for the next period

GGUS report generator

Further development of the new report generator according to the project plan.

xGUS for France Grilles

Finalise the set up a xGUS based helpdesk for the french national VO vo.france-grilles.fr which is a catch-all VO for multiple communities.

xGUS for NGI Slovenia

Finalise the set up a xGUS based helpdesk for the NGI Slovenia (NGI_SI)

GGUS-SNOW interface

There are still some minor changes waiting for implementation and testing, e.g. the distinction between incidents and requests in SNOW.

Interfaces with other ticketing systems

Set up interface for new NGI_FRANCE ticketing system OTRS.

High availability

  • Auto-switching between Logic Servers
  • On call duty service integration