Difference between revisions of "EGI-InSPIRE:SA1.6-QR8"
Jump to navigation
Jump to search
(Created page with "__NOTOC__ = 1. Task Meetings = <!-- Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all tas...") |
|||
Line 31: | Line 31: | ||
== Report Generator == | == Report Generator == | ||
A prototype was presented at the EGI community forum in March 2012. | A prototype was presented at the EGI community forum in March 2012. | ||
== GGUS structure == | == GGUS structure == | ||
Line 44: | Line 41: | ||
* 3rd level EMI Support unit -- caNL <br> | * 3rd level EMI Support unit -- caNL <br> | ||
* 3rd level EMI Support unit -- EMIR <br> | * 3rd level EMI Support unit -- EMIR <br> | ||
* EMI support unit for WNodes<br> | |||
Support units renamed in the last quarter are <br> | Support units renamed in the last quarter are <br> | ||
* 'GridView/Availabilities' SU/FE to just 'GridView' <br> | * 'GridView/Availabilities' SU/FE to just 'GridView' <br> | ||
=== VOs === | === VOs === | ||
VOs “snoplus.snolab.ca ” and "vo.cta.in2p3.fr " were added to the list of VOs which provide support via GGUS. | VOs “snoplus.snolab.ca ” and "vo.cta.in2p3.fr " were added to the list of VOs which provide support via GGUS.<br> | ||
Renamed VO "mice.gridpp.ac.uk" to "mice".<br> | |||
=== GGUS web interface === | === GGUS web interface === | ||
* | * Added new fields to track which middleware product is affected <br> | ||
* | * Updated the info section with new "did you knows?" <br> | ||
= 3. Issues and Mitigation = | = 3. Issues and Mitigation = |
Revision as of 10:17, 25 April 2012
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
weekly (phone): Participants Maria Dimou, Helmut Dres, Guenter Grein | https://www.egi.eu/indico/categoryDisplay.py?categId=27 | "shopping list" meeting | traceable at: https://savannah.cern.ch/projects/esc/ |
need driven | no INDICO URL | one on one meetings with NGI interface developers | testing the interfaces, resolving interface issues |
need driven | no INDICO URL | meetings with EGI-SA2 /EMI /IGE | definition of the technology support workflows and their implementation |
2. Main Achievements
Report Generator
A prototype was presented at the EGI community forum in March 2012.
GGUS structure
Support units
A couple of new support units have been introduced during the last quarter. They are
- NGI_UA
- 3rd level EMI Support unit -- caNL
- 3rd level EMI Support unit -- EMIR
- EMI support unit for WNodes
Support units renamed in the last quarter are
- 'GridView/Availabilities' SU/FE to just 'GridView'
VOs
VOs “snoplus.snolab.ca ” and "vo.cta.in2p3.fr " were added to the list of VOs which provide support via GGUS.
Renamed VO "mice.gridpp.ac.uk" to "mice".
GGUS web interface
- Added new fields to track which middleware product is affected
- Updated the info section with new "did you knows?"
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
Assessment of adaption of GGUS access model to meet the needs of CSIRT | This discussion is ongoing |
4. Plans for the next period
GGUS report generator
implementing new report generator and present first prototype on EGI community forum
xGUS for France Grilles
Set up a xGUS based helpdesk for the french national VO vo.france-grilles.fr which is a catch-all VO for multiple communities.
GGUS-SNOW interface
There are still some minor changes waiting for implementation and testing.
Interfaces with other ticketing systems
Set up interface for new NGI_FRANCE ticketing system OTRS.
High availability
- Auto-switching between Web Front-ends
- Auto-switching between Logic Servers
- On call duty service integration