Difference between revisions of "EGI-InSPIRE:SA1.6-QR7"
Line 91: | Line 91: | ||
= 4. Plans for the next period = | = 4. Plans for the next period = | ||
<!-- provide your text below --> | <!-- provide your text below --> | ||
== GGUS report generator == | |||
implementing new report generator and present first prototype on EGI community forum | |||
== GGUS-SNOW interface == | |||
There are still some minor changes waiting for implementation and testing. | |||
== Interfaces with other ticketing systems == | |||
Set up interface for new NGI_FRANCE ticketing system OTRS. |
Revision as of 16:25, 30 January 2012
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
weekly (phone): Participants Maria Dimou, Helmut Dres, Guenter Grein | https://www.egi.eu/indico/categoryDisplay.py?categId=27 | "shopping list" meeting | traceable at: https://savannah.cern.ch/projects/esc/ |
need driven | no INDICO URL | one on one meetings with NGI interface developers | testing the interfaces, resolving interface issues |
need driven | no INDICO URL | meetings with EGI-SA2 /EMI /IGE | definition of the technology support workflows and their implementation |
2. Main Achievements
LHCOPN TTS
Opened LHCOPN TTS towards standard GGUS tickets
Discussion with CSIRT
Assessment of adaption of GGUS access model to meet the needs of CSIRT. This discussion is ongoing.
Report Generator
Implementation of the new report generator has started. A first prototype will be presented on EGI community forum in March 2012.
Integration of new NGIs
Assuming that the nordic and baltic countries are covered by NGI_NDGF all NGIs besides Russia are integrated now. ROC_Russia awaits finishing the setup of NGI Georgia before starting the transition process.
GGUS-SNOW interface
Enhanced GGUS-SNOW interface and fine tuned synchronization work flow.
GGUS structure
Support units
A couple of new support units have been introduced during the last quarter. They are
- EMI UI
- EMI WN
- MPI User Support
Support units decommissioned in the last quarter are
- GridMap
All decommissioned support units have been moved to the list of former support units.
The "Operations" support unit was moved from category "Other" to category "EGI" in the support unit drop down list.
VOs
VOs “israelvo.isragrid.org.il” and "shiwa-workflow.eu" were added to the list of VOs which provide support via GGUS.
GGUS web interface
- Implemented warning in case of concurrent ticket updates
- Grid certificates now required for registration in GGUS
- Implemented automatic ticket closing for tickets in status "solved" or "unsolved"
- Updated mail templates
- Replaced reply mail address "ignored@ggus.org" by "ignored@ggus.eu" for reminder mails
- Updated priority colour algorithm
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
4. Plans for the next period
GGUS report generator
implementing new report generator and present first prototype on EGI community forum
GGUS-SNOW interface
There are still some minor changes waiting for implementation and testing.
Interfaces with other ticketing systems
Set up interface for new NGI_FRANCE ticketing system OTRS.