Difference between revisions of "EGI-InSPIRE:SA1.6-QR7"
Jump to navigation
Jump to search
Line 39: | Line 39: | ||
== Integration of new NGIs == | == Integration of new NGIs == | ||
Assuming that the nordic and baltic countries are covered by NGI_NDGF all NGIs besides Russia are integrated now. ROC_Russia awaits finishing the setup of NGI Georgia before starting the transition process. | Assuming that the nordic and baltic countries are covered by NGI_NDGF all NGIs besides Russia are integrated now. ROC_Russia awaits finishing the setup of NGI Georgia before starting the transition process. | ||
-- | |||
== GGUS-SNOW interface == | |||
Enhanced GGUS-SNOW interface and fine tuned synchronization work flow. | |||
= 3. Issues and Mitigation = | = 3. Issues and Mitigation = |
Revision as of 15:03, 30 January 2012
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
weekly (phone): Participants Maria Dimou, Helmut Dres, Guenter Grein | https://www.egi.eu/indico/categoryDisplay.py?categId=27 | "shopping list" meeting | traceable at: https://savannah.cern.ch/projects/esc/ |
need driven | no INDICO URL | one on one meetings with NGI interface developers | testing the interfaces, resolving interface issues |
need driven | no INDICO URL | meetings with EGI-SA2 /EMI /IGE | definition of the technology support workflows and their implementation |
2. Main Achievements
LHCOPN TTS
Opened LHCOPN TTS towards standard GGUS tickets
Discussion with CSIRT
Assessment of adaption of GGUS access model to meet the needs of CSIRT. This discussion is ongoing.
Report Generator
Implementation of the new report generator has started. A first prototype will be presented on EGI community forum in March 2012.
Integration of new NGIs
Assuming that the nordic and baltic countries are covered by NGI_NDGF all NGIs besides Russia are integrated now. ROC_Russia awaits finishing the setup of NGI Georgia before starting the transition process.
GGUS-SNOW interface
Enhanced GGUS-SNOW interface and fine tuned synchronization work flow.
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|