Difference between revisions of "EGI-InSPIRE:SA1.6-QR12"
Jump to navigation
Jump to search
(8 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
= 1. Task Meetings = <!-- | = 1. Task Meetings = <!-- | ||
Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all task meetings participants are ALWAYS recorded either on indico from the registrants’ list, or in the minutes. | Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all task meetings participants are ALWAYS recorded either on indico from the registrants’ list, or in the minutes. | ||
Line 12: | Line 15: | ||
! style="width: 50%" | Outcome | ! style="width: 50%" | Outcome | ||
|- | |- | ||
| ... | | weekly (phone): Participants Maria Dimou, Helmut Dres, Guenter Grein | ||
| .... | | https://www.egi.eu/indico/categoryDisplay.py?categId=27 | ||
| ... | | "shopping list" meeting | ||
| | | traceable at: https://savannah.cern.ch/projects/esc/ and https://rt.egi.eu/rt/Dashboards/2636/GGUS-Requirements | ||
|- | |||
| monthly (web conf): Representatives from EMI, EGI, IGE, NGIs, GGUS team, WLCG | |||
| https://indico.egi.eu/indico/categoryDisplay.py?categId=78 | |||
| GGUS Advisory board meeting | |||
| Further development of GGUS system | |||
|- | |||
| need driven | |||
| no INDICO URL | |||
| one on one meetings with NGI interface developers | |||
| testing the interfaces, resolving interface issues | |||
|- | |||
| need driven | |||
| no INDICO URL | |||
| meetings with EGI-SA2 /EMI /IGE | |||
| definition of the technology support workflows and their implementation | |||
|- | |- | ||
|} | |} | ||
Line 22: | Line 40: | ||
Note. This is a detailed account of progress over the previous quarter of activities within the task. | Note. This is a detailed account of progress over the previous quarter of activities within the task. | ||
PLEASE PROVIDE TEXT IN A GOOD EDITED FORM (AVOID BULLET LISTS OF SHORT ITEMS THAT REQUIRE EXPANSION WHEN INSERTED IN AN OVERALL REPORT) | PLEASE PROVIDE TEXT IN A GOOD EDITED FORM (AVOID BULLET LISTS OF SHORT ITEMS THAT REQUIRE EXPANSION WHEN INSERTED IN AN OVERALL REPORT) | ||
--> | --> | ||
== Report Generator == | |||
Most features of the Report Generator went online with the Feb release. | |||
However some minor changes are still to be done: | |||
[https://rt.egi.eu/rt/Ticket/Display.html?id=4750 RT 4750] | |||
[https://rt.egi.eu/rt/Ticket/Display.html?id=4752 RT 4752] | |||
== GGUS structure == | |||
=== Support units === | |||
Decommissioned support units<br> | |||
* "gLite Release Pages and Repository" | |||
* "NGI_ZA" | |||
New support units<br> | |||
* "UI WN Tarball" | |||
=== VOs === | |||
Decommissioned VO | |||
* "ict.vo.ibergrid.eu" | |||
* "demo.vo.edges-grid.eu" | |||
* "vo.sixt.cern.ch" | |||
* "vo.gear.cern.ch" | |||
* "israelvo.isragrid.org.il" | |||
Introduced new VO | |||
* "ops.ndgf.org"<br> | |||
Review of VOs with low number of tickets or without any tickets in GGUS and checking the members of the VO mailing lists. | |||
== GGUS web portal == | |||
* New "Did you knows?" about the following topics: | |||
- Info about team and alarm members/tickets | |||
- Ticket relation in GGUS | |||
- Brief instruction how to process GGUS tickets | |||
* Decommission of the software release dashboard | |||
* Implementation of an ticket monitoring dashboard (only visible for authorised staff) | |||
* New info pages for TEAMers and ALARMers | |||
== GGUS system == | |||
* Finished migration of GGUS mail boxes to new KIT mail infrastructure.<br> | |||
* Clarified meaning of status "waiting for reply".<br> | |||
* Review of VOs providing support via GGUS. | |||
== Interfaces with other ticketing systems == | |||
* Fixed bugs in interface to CERN SNOW. | |||
* Implementation of interface for IBERGRID RT ticketing system. | |||
* Updated interface with NGI_CZ RT due to system migration of RT. | |||
* Updated GGUS host certificate. | |||
== Alarm tests after GGUS releases == | |||
* Executed the alarm and interface tests after GGUS releases. | |||
== High availability == | |||
* Skipped auto-switching approach. Switching to the backup machines will be done using a management script that can be run by GGUS admins or the KIT on-call service at any time. | |||
= 3. Issues and Mitigation = <!-- fill the table below | = 3. Issues and Mitigation = <!-- fill the table below | ||
Line 32: | Line 102: | ||
! scope="col" | Mitigation Description | ! scope="col" | Mitigation Description | ||
|- | |- | ||
| | |Collaboration of GGUS with CSIRT | ||
| | |CSIRT decided not using GGUS. | ||
|- | |- | ||
| | |Collaboration of GGUS and PRACE | ||
| | |This action is postponed as it has only low priority for PRACE at the moment. | ||
|} | |} | ||
= 4. Plans for the next period = <!-- provide your text below. PLEASE PROVIDE TEXT IN A GOOD EDITED FORM (NO BULLET LISTS OF SHORT ITEMS THAT REQUIRE EXPANSION WHEN INSERTED IN A REPORT) --> | = 4. Plans for the next period = <!-- provide your text below. PLEASE PROVIDE TEXT IN A GOOD EDITED FORM (NO BULLET LISTS OF SHORT ITEMS THAT REQUIRE EXPANSION WHEN INSERTED IN A REPORT) --> | ||
== GGUS report generator == | |||
Implement some minor requirements that came up lately. | |||
== GGUS structure == | |||
* Integration of Operations Portal in GGUS. This action is postponed as requested by Operations Portal admins.<br> | |||
* Implement a SAML/Shibboleth based access to GGUS. | |||
* Fully integrate CMS VO in GGUS and retire interface to Savannah. | |||
* Migrate GGUS shopping list from Savannah to JIRA. | |||
== Interfaces with other ticketing systems == | |||
* Implement interface to PRACE RT system. | |||
* Implement interface to DANTE ticketing system. |
Latest revision as of 18:07, 6 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
weekly (phone): Participants Maria Dimou, Helmut Dres, Guenter Grein | https://www.egi.eu/indico/categoryDisplay.py?categId=27 | "shopping list" meeting | traceable at: https://savannah.cern.ch/projects/esc/ and https://rt.egi.eu/rt/Dashboards/2636/GGUS-Requirements |
monthly (web conf): Representatives from EMI, EGI, IGE, NGIs, GGUS team, WLCG | https://indico.egi.eu/indico/categoryDisplay.py?categId=78 | GGUS Advisory board meeting | Further development of GGUS system |
need driven | no INDICO URL | one on one meetings with NGI interface developers | testing the interfaces, resolving interface issues |
need driven | no INDICO URL | meetings with EGI-SA2 /EMI /IGE | definition of the technology support workflows and their implementation |
2. Main Achievements
Report Generator
Most features of the Report Generator went online with the Feb release. However some minor changes are still to be done: RT 4750 RT 4752
GGUS structure
Support units
Decommissioned support units
- "gLite Release Pages and Repository"
- "NGI_ZA"
New support units
- "UI WN Tarball"
VOs
Decommissioned VO
- "ict.vo.ibergrid.eu"
- "demo.vo.edges-grid.eu"
- "vo.sixt.cern.ch"
- "vo.gear.cern.ch"
- "israelvo.isragrid.org.il"
Introduced new VO
- "ops.ndgf.org"
Review of VOs with low number of tickets or without any tickets in GGUS and checking the members of the VO mailing lists.
GGUS web portal
- New "Did you knows?" about the following topics:
- Info about team and alarm members/tickets - Ticket relation in GGUS - Brief instruction how to process GGUS tickets
- Decommission of the software release dashboard
- Implementation of an ticket monitoring dashboard (only visible for authorised staff)
- New info pages for TEAMers and ALARMers
GGUS system
- Finished migration of GGUS mail boxes to new KIT mail infrastructure.
- Clarified meaning of status "waiting for reply".
- Review of VOs providing support via GGUS.
Interfaces with other ticketing systems
- Fixed bugs in interface to CERN SNOW.
- Implementation of interface for IBERGRID RT ticketing system.
- Updated interface with NGI_CZ RT due to system migration of RT.
- Updated GGUS host certificate.
Alarm tests after GGUS releases
- Executed the alarm and interface tests after GGUS releases.
High availability
- Skipped auto-switching approach. Switching to the backup machines will be done using a management script that can be run by GGUS admins or the KIT on-call service at any time.
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
Collaboration of GGUS with CSIRT | CSIRT decided not using GGUS. |
Collaboration of GGUS and PRACE | This action is postponed as it has only low priority for PRACE at the moment. |
4. Plans for the next period
GGUS report generator
Implement some minor requirements that came up lately.
GGUS structure
- Integration of Operations Portal in GGUS. This action is postponed as requested by Operations Portal admins.
- Implement a SAML/Shibboleth based access to GGUS.
- Fully integrate CMS VO in GGUS and retire interface to Savannah.
- Migrate GGUS shopping list from Savannah to JIRA.
Interfaces with other ticketing systems
- Implement interface to PRACE RT system.
- Implement interface to DANTE ticketing system.