Difference between revisions of "EGI-InSPIRE:SA1.4-QR7"
(Created page with '__NOTOC__ = 1. Task Meetings = <!-- Notes. Report here all task-specific meetings held. This includes (a) face-to-face meetings and (b) phone meetings. Make sure that for all tas…') |
|||
Line 23: | Line 23: | ||
|} | |} | ||
= 2. Main Achievements = | = 2. Main Achievements = | ||
< | |||
Two new versions of ActiveMQ were deployed on the production broker network: 5.5 on November 29th and 5.5.1 on January 30/31st. The following changes were implemented with new versions: | |||
-- | * Camel routes switched off, SAM to use wildcard subscriptions instead. | ||
* Automatic closing of inactive STOMP connections after '''one hour'''. <br>Note: Inactive connections are overloading brokers and currently we clear them manually periodically. Clients will reconnect automatically. | |||
Two new versions of Operations portal were deployed in this quarter: 2.7 on November 9th and 2.8 on December 21st. Detailed list of new features can be found in JRA1 section. At the end of the quarter there were four NGI instances: NGI_BY, NGI_CZ, NGI_GRNET and NGI_IBERGRID. Decommission of the old CIC portal (cic.egi.eu) was postponed and is planned for the May 2012. List of operations tests was extended on January 2nd with the following tests: | |||
* org.nagios.BDII-Check | |||
* org.sam.CREMCE-DirectJobSubmit | |||
* hr.srce.LB-CertLifetime | |||
* hr.srce.MyProxy-Store | |||
* org.nagios.GridFTP-Check | |||
* org.sam.WMS-JobSubmit. | |||
One new versions of SAM was deployed in this quarter: SAM-Update15 on November 29th. At the end of the quarter following SAM/Nagios instances were in production: | |||
* 26 NGI instances covering 37 EGI partners | |||
* 2 ROC instances covering 2 EGI partners | |||
* 1 project instances covering 1 EGI partners | |||
* 3 external ROC instances covering the following regions: Canada, IGALC and LA. | |||
Detailed list of SAM/Nagios instances can be found on the following page: [[SAM Instances]]. | |||
= 3. Issues and Mitigation = | = 3. Issues and Mitigation = |
Revision as of 11:40, 8 February 2012
1. Task Meetings
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
2. Main Achievements
Two new versions of ActiveMQ were deployed on the production broker network: 5.5 on November 29th and 5.5.1 on January 30/31st. The following changes were implemented with new versions:
- Camel routes switched off, SAM to use wildcard subscriptions instead.
- Automatic closing of inactive STOMP connections after one hour.
Note: Inactive connections are overloading brokers and currently we clear them manually periodically. Clients will reconnect automatically.
Two new versions of Operations portal were deployed in this quarter: 2.7 on November 9th and 2.8 on December 21st. Detailed list of new features can be found in JRA1 section. At the end of the quarter there were four NGI instances: NGI_BY, NGI_CZ, NGI_GRNET and NGI_IBERGRID. Decommission of the old CIC portal (cic.egi.eu) was postponed and is planned for the May 2012. List of operations tests was extended on January 2nd with the following tests:
- org.nagios.BDII-Check
- org.sam.CREMCE-DirectJobSubmit
- hr.srce.LB-CertLifetime
- hr.srce.MyProxy-Store
- org.nagios.GridFTP-Check
- org.sam.WMS-JobSubmit.
One new versions of SAM was deployed in this quarter: SAM-Update15 on November 29th. At the end of the quarter following SAM/Nagios instances were in production:
- 26 NGI instances covering 37 EGI partners
- 2 ROC instances covering 2 EGI partners
- 1 project instances covering 1 EGI partners
- 3 external ROC instances covering the following regions: Canada, IGALC and LA.
Detailed list of SAM/Nagios instances can be found on the following page: SAM Instances.
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|