Difference between revisions of "EGI-InSPIRE:SA1.4-QR6"
Line 61: | Line 61: | ||
= 4. Plans for the next period = | = 4. Plans for the next period = | ||
Decommission of the old CIC portal (cic.egi.eu) is planned for the next quarter. | |||
Track and perform planned tests of failover configurations of centralized tools. | |||
Deploy new SAM instance dedicated for monitoring operational tools with the new probes provided by operational tools developers. |
Revision as of 09:20, 7 November 2011
1. Task Meetings
There are no specific SA1.4 meetings. It was agreed to discuss all deployment issues with operational tool representatives at the JRA1 meetings. Below is the list of JRA1 meetings and subjects relevant for SA1.4 which were discussed.
Date (dd/mm/yyyy) | Url Indico Agenda | Title | Outcome |
---|---|---|---|
01/09/2011 | https://www.egi.eu/indico/conferenceDisplay.py?confId=577 | InSPIRE-JRA1 phone conf | Regionalization plans for all tools. |
15/09/2011 | https://www.egi.eu/indico/conferenceDisplay.py?confId=608 | InSPIRE-JRA1 phone conf | Metric portal status. Technical forum planning. |
20/09/2011 | https://www.egi.eu/indico/sessionDisplay.py?sessionId=78&confId=452#20110920 | Operations Tools and Availability Calculation (EGI TF) | Dedicated EGI TF session on operational tools monitoring and availability calculation. |
30/09/2011 | https://www.egi.eu/indico/conferenceDisplay.py?confId=648 | A/R calculation TF session follow up | Continued discussion on availability and reliability calculation. |
20/10/2011 | https://www.egi.eu/indico/conferenceDisplay.py?confId=608 | InSPIRE-JRA1 phone conf | Status of VO SAM instance support. |
2. Main Achievements
Two new versions of Operations portal were deployed in this quarter: 2.6.3 on August 5th and 2.6.4 on September 29th. Detailed list of new features can be found in JRA1 section. At the end of the quarter there were four NGI instances: NGI_BY, NGI_CZ, NGI_GRNET and NGI_IBERGRID. Decommission of the old CIC portal (cic.egi.eu) was postponed and is planned for the next quarter.
Two new versions of SAM were deployed in this quarter: SAM-Update13 on September 7th and SAM-Update14 on October 22th. SAM/Nagios deployment of NGI instances continued. As part of the NGI UK creation UKI ROC SAM instance was switched to NGI instance covering two NGIs: NGI_IE (Ireland) and the new NGI_UK. At the end of the quarter following SAM/Nagios instances were in production:
- 26 NGI instances covering 37 EGI partners
- 2 ROC instances covering 2 EGI partners
- 1 project instances covering 1 EGI partners
- 3 external ROC instances covering the following regions: Canada, IGALC and LA.
Detailed list of SAM/Nagios instances can be found on the following page: SAM Instances.
3. Issues and Mitigation
Issue Description | Mitigation Description |
---|---|
4. Plans for the next period
Decommission of the old CIC portal (cic.egi.eu) is planned for the next quarter.
Track and perform planned tests of failover configurations of centralized tools.
Deploy new SAM instance dedicated for monitoring operational tools with the new probes provided by operational tools developers.