Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Review procedure"

From EGIWiki
Jump to navigation Jump to search
 
Line 1: Line 1:
{{Menubar_Deliverables_and_Milestones}}
{{EGI-Inspire_menubar}}
{{TOC_right}} {{Menubar_Deliverables_and_Milestones}}
The formal outputs from the project (milestones and deliverables) will pass through a formal review process. The review process is timed to ensure the output is available to the EC at the end of the project month (PM) that the material is due.
The formal outputs from the project (milestones and deliverables) will pass through a formal review process. The review process is timed to ensure the output is available to the EC at the end of the project month (PM) that the material is due.


Line 13: Line 14:


Once the review process has been completed, the project office will produce a PDF of the document and upload this to the document repository and submit the material to the EC.
Once the review process has been completed, the project office will produce a PDF of the document and upload this to the document repository and submit the material to the EC.
[[Category: Deliverables and Milestones]]

Latest revision as of 20:45, 24 December 2014

EGI Inspire Main page



Deliverables and Milestones: Home Review procedure Review process Review Roles Review workflow Review timetable


The formal outputs from the project (milestones and deliverables) will pass through a formal review process. The review process is timed to ensure the output is available to the EC at the end of the project month (PM) that the material is due.

The activity manager from the activity that is producing the document is responsible for updating its status in the Request Tracker as it moves through its various stages. This includes:

  • Adding in the document URL form the Document store once it is available.
  • Adding the reviewer moderator and reviewers once known
  • Updating the ticket history with any additional information relating to delays, problems, etc.


Review process for deliverables and milestones

Deliverable and Milestone review workflow

Once the review process has been completed, the project office will produce a PDF of the document and upload this to the document repository and submit the material to the EC.