Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Poland-QR7"

From EGIWiki
Jump to navigation Jump to search
Line 8: Line 8:
! scope="col" | Author
! scope="col" | Author
|-
|-
| 7
| 7  
| NGI_PL
| NGI_PL  
| CYFRONET
| CYFRONET  
| Małgorzata Krakowian
| Małgorzata Krakowian
|}
|}
Line 37: Line 37:
! Outcome (Short report & Indico URL)
! Outcome (Short report & Indico URL)
|-
|-
| 4-7.01.2012
| 4-7.01.2012  
| Zakopane, Poland
| Zakopane, Poland  
| Grid Computing - The Next Decade
| Grid Computing - The Next Decade  
| 47
| 47  
|  
|  
https://gridlab.man.poznan.pl/Meetings/Zakopane2012/indexman.html
https://gridlab.man.poznan.pl/Meetings/Zakopane2012/indexman.html  


|}
|}


=== 1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED  ===
=== 1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED  ===


{| cellspacing="0" border="1"
{| cellspacing="0" border="1"
|-
|-
! scope="col" |  
! scope="col" |  
Date
Date  


! Location  
! Location  
Line 60: Line 58:
! Outcome (Short report & Indico URL)
! Outcome (Short report & Indico URL)
|-
|-
| 9-10/11/2011
| 9-10/11/2011  
| Holand
| Holand  
| NGI Coordinators Kick Off meeting
| NGI Coordinators Kick Off meeting  
| 1
| 1  
|  
|  
|-
|-
| 3-4/11/2011
| 3-4/11/2011  
| Holand
| Holand  
| Projekt Managment Board <br> EGI-Inspire
| Projekt Managment Board <br> EGI-Inspire  
| 1
| 1  
|  
|  
|-
|-
| 23-24/01/2012
| 23-24/01/2012  
| Holand
| Holand  
| OMB
| OMB  
| 1
| 1  
|  
|  
|-
|-
| 26-24/01/2012
| 26-24/01/2012  
| Holand
| Holand  
| PMB EGI-INSPIRE
| PMB EGI-INSPIRE  
| 1
| 1  
|  
|  
|-
|-
| 12-18/11/2011
| 12-18/11/2011  
| Seattle, Stany Zjednoczone Ameryki Północnej
| Seattle, Stany Zjednoczone Ameryki Północnej  
| Supercomputing 11
| Supercomputing 11  
| 1
| 1  
| http://sc11.supercomputing.org
| http://sc11.supercomputing.org
|}
|}
Line 95: Line 93:
|<Date>||<Location>||Title||Participants||Outcome  
|<Date>||<Location>||Title||Participants||Outcome  
|-
|-
-->
-->  


===1.3. PUBLICATIONS=== <!--List all publications as bullet points, detailing: Publication title, author(s), journal title, number/issue, date. Also mention any articles published further to interviews given by members of your activity.-->  
===1.3. PUBLICATIONS=== <!--List all publications as bullet points, detailing: Publication title, author(s), journal title, number/issue, date. Also mention any articles published further to interviews given by members of your activity.-->  
Line 101: Line 99:
{| cellspacing="0" cellpadding="2" border="1"
{| cellspacing="0" cellpadding="2" border="1"
|-
|-
! scope="col" | Publication title
! scope="col" | Publication title  
! Journal / Proceedings title
! Journal / Proceedings title  
! align="left" | Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''
! align="left" | Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''  
! align="left" | Authors ''<br>1.<br>2.<br>3.<br>Et al?''
! align="left" | Authors ''<br>1.<br>2.<br>3.<br>Et al?''
|}
|}
Line 112: Line 110:


#'''Nagios'''  
#'''Nagios'''  
##Production instance: Actualization to version SAM15
##Production instance: Actualization to version SAM15  
##Testing instance: Actualization to version SAM15 and UNICORE&nbsp;tests testing<br>  
##Testing instance: Actualization to version SAM15 and UNICORE&nbsp;tests testing<br>  
#<span style="font-weight: bold;">Regional Helpdesk</span>  
#<span style="font-weight: bold;">Regional Helpdesk</span>  
Line 150: Line 148:
##TASK  
##TASK  
###New services: UNICORE, CREAM-CE<br>  
###New services: UNICORE, CREAM-CE<br>  
###New hardware: new cluster Galera Plus (192 nodes, each 12-cores), vSMP machine (768-cores available as one).
###New hardware: new cluster Galera Plus (192 nodes, each 12-cores), vSMP machine  
##WARSAW_EGEE  
##WARSAW_EGEE  
###Actualization of unicore-gateway to version 4.2.0 and uvos-server to version 1.5.0  
###Actualization of unicore-gateway to version 4.2.0 and uvos-server to version 1.5.0  
###New services: QosCosGrid&lt;span class="clickylink" /&gt;
###New services: QosCosGrid  
###New hardware: 12 TFPS  
###New hardware: 12 TFPS  
##New site certified: NGI_PL_SERVICES<br>  
##New site certified: NGI_PL_SERVICES<br>  
Line 160: Line 158:
##UNICORE Integration TF<br>
##UNICORE Integration TF<br>


=== 2.2. Main Achievements ===
=== 2.2. Main Achievements ===


# NGI_PL is highly involved in several task forces. We support and introduce a <span lang="en" id="result_box" class="short_text"><span class="hps">wide range of middlewares (glite, UNICORE, QCG) to </span></span><span lang="en" id="result_box" class="short_text"><span class="hps">adapt to the</span> <span class="hps">demands and</span> <span class="hps">needs of users.</span></span>  
We support and introduce a <span lang="en" class="short_text" id="result_box"><span class="hps">wide range of middlewares (glite, UNICORE, QCG) to </span></span><span lang="en" class="short_text" id="result_box"><span class="hps">adapt to the</span> <span class="hps">demands and</span> <span class="hps">needs of users. </span></span>


=== 2.3. Issues and mitigation ===
=== 2.3. Issues and mitigation ===


{| cellspacing="0" cellpadding="2" border="1"
{| cellspacing="0" cellpadding="2" border="1"

Revision as of 11:50, 3 February 2012


Quarterly Report Number NGI Name Partner Name Author
7 NGI_PL CYFRONET Małgorzata Krakowian


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
4-7.01.2012 Zakopane, Poland Grid Computing - The Next Decade 47

https://gridlab.man.poznan.pl/Meetings/Zakopane2012/indexman.html

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date

Location Title Participants Outcome (Short report & Indico URL)
9-10/11/2011 Holand NGI Coordinators Kick Off meeting 1
3-4/11/2011 Holand Projekt Managment Board
EGI-Inspire
1
23-24/01/2012 Holand OMB 1
26-24/01/2012 Holand PMB EGI-INSPIRE 1
12-18/11/2011 Seattle, Stany Zjednoczone Ameryki Północnej Supercomputing 11 1 http://sc11.supercomputing.org


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

  1. Nagios
    1. Production instance: Actualization to version SAM15
    2. Testing instance: Actualization to version SAM15 and UNICORE tests testing
  2. Regional Helpdesk
    1. Moving to more automatized process of handling tickets in regliona helpdesk.
  3. Unicore
    1. Monitoring: testing, debugging and sugesting SAM fixes related to UNICORE. Refactoring of UNICORE configuration module for SAM.
    2. Accounting: Integration with APEL enters testing phase.
    3. Stage rollout components testing: UNICORE Gateway, UVOS
  4. Availability/Reliability metrics
    1. NGI_PL metrics:  November 96%, December 99%; All sites above the targets.
    2. BDII metrics: November 99%, December 100%;
  5. NGI_PL security team
    1. Incident response and investigation for security incident at Cyfronet, EGI CSIRT incident id: EGI-20111231-01
    2. Regular operational actions within EGI CSIRT IRTF
    3. Taking part in weekly and monthly meetings of EGI CSIRT
    4. Removing critical vulnerabilities in IFJ-PAN-BG, including checking whole site infrastructure
    5. Performing security pentesting for WUT site
    6. Submission of 1 vulnerability to EGI SVG
    7. Delegating participant to D4.4 "Security Risk Assessment of the EGI Infrastructure"
  6. ROD NGI_PL
    1. Coordination of lcg-CE decommission within NGI
    2. Creation of NGI_PL_SERVICES site, designed for caluculation RP availablity and reliability metrics
    3. ROD team didn't exceed ROD performance index target 
  7. Changes on sites
    1. CYFRONET-LCG2
      1. Decomission of lcg-CE
      2. Upgrade of DPM
      3. New services: 
        1. cream02.grid - CREAMCE  UMD
        2. wms01.grid    - WMS EMI
        3. myproxy02.grid - MYPROXY UMD
    2. WCSS-PPS
      1. Migration from gLite 3.2 to UMD 1.0
      2. Moving Site-BDII from CREAM to new host
    3. PSNC
      1. New services: UNICORE
    4. TASK
      1. New services: UNICORE, CREAM-CE
      2. New hardware: new cluster Galera Plus (192 nodes, each 12-cores), vSMP machine
    5. WARSAW_EGEE
      1. Actualization of unicore-gateway to version 4.2.0 and uvos-server to version 1.5.0
      2. New services: QosCosGrid
      3. New hardware: 12 TFPS
    6. New site certified: NGI_PL_SERVICES
  8. Task forces in which NGI_PL participate
    1. Regionalisation TF
    2. UNICORE Integration TF

2.2. Main Achievements

We support and introduce a wide range of middlewares (glite, UNICORE, QCG) to adapt to the demands and needs of users.

2.3. Issues and mitigation

Issue Description Mitigation Description