Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Poland-QR7"

From EGIWiki
Jump to navigation Jump to search
Line 113: Line 113:
#'''Nagios'''  
#'''Nagios'''  
##Pr  
##Pr  
#'''Unicore'''
##<br>
##Monitoring: testing, debugging and sugesting SAM fixes related to UNICORE. Refactoring of UNICORE&nbsp;configuration module for SAM.
#<span style="font-weight: bold;">Regional Helpdesk</span>
##Accounting:&nbsp;Integration with APEL enters testing phase. <span lang="en" id="result_box" class="short_text"><span class="hps" /></span>
##Moving to more automatized process of handling tickets in regliona helpdesk.<br>
#'''Unicore'''  
##Monitoring: testing, debugging and sugesting SAM fixes related to UNICORE. Refactoring of UNICORE&nbsp;configuration module for SAM.  
##Accounting:&nbsp;Integration with APEL enters testing phase.  
##Stage rollout components testing:&nbsp;UNICORE Gateway, UVOS  
##Stage rollout components testing:&nbsp;UNICORE Gateway, UVOS  
#'''Availability/Reliability metrics'''  
#'''Availability/Reliability metrics'''  
##NGI_PL metrics:&nbsp; November 96%, December 99%; All sites above the targets.
##NGI_PL metrics:&nbsp; November 96%, December 99%; All sites above the targets.  
##BDII metrics: November 99%, December 100%;  
##BDII metrics: November 99%, December 100%;  
#'''NGI_PL security team '''  
#'''NGI_PL security team '''  
##incident response and investigation for security incident at Cyfronet, EGI CSIRT incident id: EGI-20111231-01  
##Incident response and investigation for security incident at Cyfronet, EGI CSIRT incident id: EGI-20111231-01  
##regular operational actions within EGI CSIRT IRTF  
##Regular operational actions within EGI CSIRT IRTF  
##taking part in weekly and monthly meetings of EGI CSIRT  
##Taking part in weekly and monthly meetings of EGI CSIRT  
##removing critical vulnerabilities in IFJ-PAN-BG, including checking whole site infrastructure  
##Removing critical vulnerabilities in IFJ-PAN-BG, including checking whole site infrastructure  
##performing security pentesting for WUT site  
##Performing security pentesting for WUT site  
##submission of 1 vulnerability to EGI SVG  
##Submission of 1 vulnerability to EGI SVG  
##delegating participant to D4.4 "Security Risk Assessment of the EGI Infrastructure"&lt;/span&gt;
##Delegating participant to D4.4 "Security Risk Assessment of the EGI Infrastructure"  
#'''ROD&nbsp;NGI_PL'''  
#'''ROD&nbsp;NGI_PL'''  
##Coordination of lcg-CE decommission within NGI
##Coordination of lcg-CE decommission within NGI  
##Creation of NGI_PL_SERVICES site, designed for caluculation RP availablity and reliability metrics  
##Creation of NGI_PL_SERVICES site, designed for caluculation RP availablity and reliability metrics  
##ROD&nbsp;team didn't exceed ROD&nbsp;performance index target&nbsp;  
##ROD&nbsp;team didn't exceed ROD&nbsp;performance index target&nbsp;  
#'''Changes on sites '''  
#'''Changes on sites '''  
##WCSS64
##CYFRONET-LCG2
###new services UNICORE, QCG<br>  
###Decomission of lcg-CE
##CAMK
###Upgrade of DPM<br>
###Migration to ScientificLinux 5.6 and gLite 3.2  
###New services:&nbsp;
###SE is working right now as SRM and SRMv2
####cream02.grid - CREAMCE&nbsp; UMD<br>
###new services: CREAMCE, APEL
####wms01.grid&nbsp;&nbsp;&nbsp; - WMS EMI<br>  
###new hardware 120TB disc space RAID6 and 144 cores Xeon X5650
####myproxy02.grid - MYPROXY&nbsp;UMD
##WCSS-PPS
###Migration from gLite 3.2 to UMD 1.0
###Moving Site-BDII from CREAM to new host<br>
##PSNC
###New services: UNICORE<br>
##TASK  
##TASK  
###new services:&nbsp;QosCosGrid and UMD Cream
###New services: UNICORE, CREAM-CE<br>
###new hardware: 191 nodes and vSMP machine.  
###New hardware: new cluster Galera Plus (192 nodes, each 12-cores), vSMP machine (768-cores available as one).  
##WARSAW_EGEE  
##WARSAW_EGEE  
###new services: ce.polgrid.pl&lt;span class="clickylink" /&gt;, se5.polgrid.pl &lt;span class="clickylink" /&gt;
###Actualization of unicore-gateway to version 4.2.0 and uvos-server to version 1.5.0
###<span class="clickylink">new hardware:</span> 120 x (2CPU (Intel Xeon X5660) + 24GB RAM ), and&nbsp; 32x ( 2CPU(AMD Opteron 2435)&nbsp; + 32GB RAM),&nbsp; SunFire 4540 48TB raw
###New services: QosCosGrid<span class="clickylink" />  
##New site certified: WUT<br>  
###New hardware: 12 TFPS
##New site certified: NGI_PL_SERVICES<br>  
#'''Task forces in which NGI_PL&nbsp;participate'''  
#'''Task forces in which NGI_PL&nbsp;participate'''  
##Regionalisation TF  
##Regionalisation TF  
##UNICORE Integration TF  
##UNICORE Integration TF<br>
##<br>


=== 2.2. Main Achievements ===
=== 2.2. Main Achievements ===

Revision as of 11:41, 3 February 2012


Quarterly Report Number NGI Name Partner Name Author
7 NGI_PL CYFRONET Małgorzata Krakowian


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
4-7.01.2012 Zakopane, Poland Grid Computing - The Next Decade 47

https://gridlab.man.poznan.pl/Meetings/Zakopane2012/indexman.html

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date

Location Title Participants Outcome (Short report & Indico URL)
9-10/11/2011 Holand NGI Coordinators Kick Off meeting 1
3-4/11/2011 Holand Projekt Managment Board
EGI-Inspire
1
23-24/01/2012 Holand OMB 1
26-24/01/2012 Holand PMB EGI-INSPIRE 1
12-18/11/2011 Seattle, Stany Zjednoczone Ameryki Północnej Supercomputing 11 1 http://sc11.supercomputing.org


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

  1. Nagios
    1. Pr

  2. Regional Helpdesk
    1. Moving to more automatized process of handling tickets in regliona helpdesk.
  3. Unicore
    1. Monitoring: testing, debugging and sugesting SAM fixes related to UNICORE. Refactoring of UNICORE configuration module for SAM.
    2. Accounting: Integration with APEL enters testing phase.
    3. Stage rollout components testing: UNICORE Gateway, UVOS
  4. Availability/Reliability metrics
    1. NGI_PL metrics:  November 96%, December 99%; All sites above the targets.
    2. BDII metrics: November 99%, December 100%;
  5. NGI_PL security team
    1. Incident response and investigation for security incident at Cyfronet, EGI CSIRT incident id: EGI-20111231-01
    2. Regular operational actions within EGI CSIRT IRTF
    3. Taking part in weekly and monthly meetings of EGI CSIRT
    4. Removing critical vulnerabilities in IFJ-PAN-BG, including checking whole site infrastructure
    5. Performing security pentesting for WUT site
    6. Submission of 1 vulnerability to EGI SVG
    7. Delegating participant to D4.4 "Security Risk Assessment of the EGI Infrastructure"
  6. ROD NGI_PL
    1. Coordination of lcg-CE decommission within NGI
    2. Creation of NGI_PL_SERVICES site, designed for caluculation RP availablity and reliability metrics
    3. ROD team didn't exceed ROD performance index target 
  7. Changes on sites
    1. CYFRONET-LCG2
      1. Decomission of lcg-CE
      2. Upgrade of DPM
      3. New services: 
        1. cream02.grid - CREAMCE  UMD
        2. wms01.grid    - WMS EMI
        3. myproxy02.grid - MYPROXY UMD
    2. WCSS-PPS
      1. Migration from gLite 3.2 to UMD 1.0
      2. Moving Site-BDII from CREAM to new host
    3. PSNC
      1. New services: UNICORE
    4. TASK
      1. New services: UNICORE, CREAM-CE
      2. New hardware: new cluster Galera Plus (192 nodes, each 12-cores), vSMP machine (768-cores available as one).
    5. WARSAW_EGEE
      1. Actualization of unicore-gateway to version 4.2.0 and uvos-server to version 1.5.0
      2. New services: QosCosGrid
      3. New hardware: 12 TFPS
    6. New site certified: NGI_PL_SERVICES
  8. Task forces in which NGI_PL participate
    1. Regionalisation TF
    2. UNICORE Integration TF

2.2. Main Achievements

  1. NGI_PL is highly involved in several task forces. We support and introduce a wide range of middlewares (glite, UNICORE, QCG) to adapt to the demands and needs of users.

2.3. Issues and mitigation

Issue Description Mitigation Description