Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

EGI-InSPIRE:Poland-QR3

From EGIWiki
Revision as of 16:52, 22 January 2015 by Krakow (talk | contribs) (moved Poland-QR3 to EGI-InSPIRE:Poland-QR3)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
3 NGI_PL CYFRONET Małgorzata Krakowian


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
01-03 December 2010 Wrocław, Poland I3 Conference 3 Many of the conference participants were involved in Polish NGI project. There were also many talks concerning NGI work mainly focused on operational problems and grid security aspects.

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
24.01-26.01 Amsterdam OMB meeting 3 https://www.egi.eu/indico/conferenceDisplay.py?confId=153
23-26.01.2011 Utrecht, Nederland EUGridPMA meeting 1 http://www.eugridpma.org/meetings/2011-01/
7-12.11.2010 Madrid, Spain Fussion community support technical meeting 1
24 January 2011 University of Göttingen / Germany Network Requirements for LHC data analysis 32 The meeting covered network requirements for Tier2 centers seen from the

perspective of the largest EGI users community. The discussion concerned mainly bandwidth requirements, desired network topology and the possibility of using dedicated channels within NRENs infrastructure to directly connect Tier1/2 centers. The outcome was to switch to mesh-like topology to lessen the load on connections between Tier1s and their associated Tier2s. For Polish NGI this means that general Geant connection becomes more important than dedicated link to DFN.

http://indico.desy.de/conferenceTimeTable.py?confId=3823


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

NGI_PL continued works related to operations. ROD and Regional Technical Support teams operated seamlessly. The size of the NGI in terms of computing and storage capabilities is growing due to recent procurements.

During last quarter all monitoring system updates were regularly applied to regional instance to keep consistency with EGI.

All sites completed migration from RGMA to ActiveMQ APEL.

2.2. Main Achievements

NGI_PL representatives participate in OLA task force and took part in discussions related to UNICORE within "Coordination of interoperations between NGIs and with other Grids" task.

NGI_PL also take part in "UNICORE integration task force" which has been recently created. The goal of the task force is to discuss various technical integration issues related to UNICORE middleware in terms of operations.

2.3. Issues and mitigation

Issue Description Mitigation Description