Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Poland-QR10"

From EGIWiki
Jump to navigation Jump to search
Line 1: Line 1:
{{Template:Op menubar}}
 
{{Template:EGI-Inspire menubar}}
 
{{Template:Inspire_reports_menubar}}
{{Template:Inspire_reports_menubar}}
{{TOC_right}}
{{TOC_right}}
[[Category:NGI QR Reports]]
{| cellspacing="0" cellpadding="2" border="1"
{| cellspacing="0" cellpadding="2" border="1"
|-
|-

Revision as of 15:36, 7 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
10
NGI_PL
CYFRONET
Tadeusz Szymocha


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)





1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
27-31.08.2012 Karlsruhe GridKa School 2012 2 http://indico.scc.kit.edu/indico/conferenceDisplay.py?ovw=True&confId=6
17-21.09.2012
Prague
EGI Technical Forum
10
http://tf2012.egi.eu/
27-28.09.2012 Ljublana Terena TF-SCIRT Meeting 1 -


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

  1. Nagios
    1. Update monitoring system to version SAM17.1 in September
  2. Unicore
    1. Preparation of Unicore Nagios probes for update SAM17.1
    2. introduction of new functionality for emi.unicore.GlobalStorage probe (testing various access protocols)
  3. Availability/Reliability metrics
    1. Availability August/September/October 94%/92%/ 89%
    2. Reliability August/September/October   94%/93%/ 94%
    3. Top BDII: all instances above target
  4. NGI_PL security team
    1. Regular operational actions within EGI CSIRT IRTF
    2. Taking part in weekly and monthly meetings of EGI CSIRT
    3. 2 representatives participated in EGI TF
    4. 1 representative participated in Terena TF-CSIRT meeting
    5. 1 site (ICM) participated in Security Site Challenge 6 organized by EGI CSIRT
  5. NGI_PL ROD team
    1. The team has been adapted to personnell changes. No service disturbance has been observed in ROD performance.
  6. Changes on sites
    1. new services
      1. WCSS64
        1. sBDII (tatooine.wcss.pl).
    2. Upgrades
      1. CAMK:
        1. Upgrade OS on all hosts to Scientific Linux 6.3
        2. Upgrade middleware on all hosts to UMD-2
      2. TASK
        1. Upgrade of se.grid.task.gda.pl to SL6 and to UMD2.0
        2. Upgrade of ce.grid.task.gda.pl (sBDII) to SL6 and to UMD2.0
      3. WCSS64
        1. Migration of CREAM to UMD 2.0.
      4. CYFRONET-LCG2
        1. Migration to EMI due to the end of gLite support
      5. ICM
        1. SLURM batch system with CREAM service has been deployed which required modification of GIP and plugins.
  7. task forces
    1. Federated Cloud Task Force
  8. trainings
    1. Due to personnel changes new COD members were trained in their duties internally at Cyfronet.

2.2. Main Achievements

All sites runing obsolete software were informed about the necessity to upgrade or decomission obsolete services. This process is well on track. Sites are deploying policy which requires user jobs to be equipped with proper compute grant ID (does not concern gLite software stack).

2.3. Issues and mitigation

Issue Description Mitigation Description