Difference between revisions of "EGI-InSPIRE:Plan 2014 Milestones"
Jump to navigation
Jump to search
(Created page with "{{Template:Op menubar}} {{Template:Inspire_reports_menubar}} {{TOC_right}} Category:EGI-inSPIRE SA1 Specify the milestones for each quarter of the calendar year of 2014 and ...") |
m (moved Plan 2014 Milestones to EGI-InSPIRE:Plan 2014 Milestones) |
||
(6 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{EGI-Inspire_menubar}} | ||
{{TOC_right}} | {{Template:Inspire_reports_menubar}} | ||
{{TOC_right}} | |||
Specify the milestones for each quarter of the calendar year of 2014 and each SA1 task. | Specify the milestones for each quarter of the calendar year of 2014 and each SA1 task. | ||
Line 13: | Line 13: | ||
** | ** | ||
** | ** | ||
= SA1.3 Staged rollout = | = SA1.3 Staged rollout = | ||
* Q1 | * Q1 | ||
** | ** Complete transition to post EMI/IGE scenario (deprecate bouncer for creating releases) | ||
** | ** | ||
* Q2 | * Q2 | ||
** | ** Migration task-force from UMD-2 to UMD-3. | ||
** | ** Prepare transition for the end of SA1.3 activities simplifying whenever possible the software provisioning workflow. This will be achieved in collaboration with SA2. | ||
= SA1.3 Interoperations = | = SA1.3 Interoperations = | ||
* Q1 | * Q1 | ||
Line 41: | Line 31: | ||
** | ** | ||
** | ** | ||
= SA1.4 Tools = | = SA1.4 Tools = | ||
Line 55: | Line 40: | ||
** | ** | ||
** | ** | ||
** | ** | ||
Line 70: | Line 51: | ||
** | ** | ||
** | ** | ||
= SA1.6 Helpdesk = | = SA1.6 Helpdesk = | ||
* Q1 | * Q1 | ||
** | ** Implementation of CMS specific portal and work flows | ||
** | ** Introduce alternative authentication/authorization processes | ||
* | ** Merge of GGUS and xGUS structures | ||
* | * Q2 | ||
** | ** Integration of operations portal | ||
* Q3 | * Q3 | ||
** | ** Implement interface for PRACE | ||
* Q4 | * Q4 | ||
** | ** Implement interface for XSEDE | ||
= SA1.7 support = | = SA1.7 support = | ||
* Q1 | * Q1 | ||
** | ** Continue software support along the established procedures | ||
** | ** Revise the procedures according to expected changes (team participation and scope of work) after May 2014 and plan the transition. | ||
* Q2 | * Q2 | ||
** | ** Move to the revised procedures of software support gradually. | ||
** | ** | ||
Line 110: | Line 78: | ||
** | ** | ||
* Q2 | * Q2 | ||
** | ** | ||
** | ** |
Latest revision as of 18:55, 24 December 2014
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Specify the milestones for each quarter of the calendar year of 2014 and each SA1 task.
SA1.2 Security
- SVG plans
- ...
- Q1
- Q2
SA1.3 Staged rollout
- Q1
- Complete transition to post EMI/IGE scenario (deprecate bouncer for creating releases)
- Q2
- Migration task-force from UMD-2 to UMD-3.
- Prepare transition for the end of SA1.3 activities simplifying whenever possible the software provisioning workflow. This will be achieved in collaboration with SA2.
SA1.3 Interoperations
- Q1
- Q2
SA1.4 Tools
- Q1
- Q2
SA1.5 Accounting
Includes the operations of both the accounting portal and the APEL central repository
- Q1
- Q2
SA1.6 Helpdesk
- Q1
- Implementation of CMS specific portal and work flows
- Introduce alternative authentication/authorization processes
- Merge of GGUS and xGUS structures
- Q2
- Integration of operations portal
- Q3
- Implement interface for PRACE
- Q4
- Implement interface for XSEDE
SA1.7 support
- Q1
- Continue software support along the established procedures
- Revise the procedures according to expected changes (team participation and scope of work) after May 2014 and plan the transition.
- Q2
- Move to the revised procedures of software support gradually.
SA1.8 Availability, core services, documentation
- Q1
- Q2