Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Plan 2013 SA1.6"

From EGIWiki
Jump to navigation Jump to search
 
(8 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[Category:EGI-inSPIRE SA1]]
{{EGI-Inspire_menubar}} {{Template:Inspire_reports_menubar}} {{TOC_right}}
<!-- please provide self explanatory text and sufficient level of details -->
<!-- please provide self explanatory text and sufficient level of details -->


Line 12: Line 12:


* xGUS instances
* xGUS instances
   Several new xGUS instances have been introduced: France Grilles, NGI_SI
   New xGUS instances have been introduced: France Grilles, NGI_SI


* High availability of GGUS
* High availability of GGUS
Line 30: Line 30:
   Migrated GGUS mail boxes to new mail infrastructure
   Migrated GGUS mail boxes to new mail infrastructure
   Review of VO specific mail boxes
   Review of VO specific mail boxes


===Milestones not accomplished===
===Milestones not accomplished===
Line 45: Line 44:
* GGUS Report Generator  
* GGUS Report Generator  
   Some fine tuning is still to be done.
   Some fine tuning is still to be done.
  Implement report [[https://rt.egi.eu/guest/Ticket/Display.html?id=4752 ETA accuracy]]


* VOMS synchronization
* VOMS synchronization
Line 52: Line 52:
   Interface for PRACE/MAPPER
   Interface for PRACE/MAPPER
   Interface for DANTE
   Interface for DANTE
  Interface for NGI_IBERGRID


* Alarm process for central operations tools
* Alarm process for central operations tools
Line 59: Line 60:
   The CSIRT team is currently evaluating whether they want to use GGUS.
   The CSIRT team is currently evaluating whether they want to use GGUS.
   If CSIRT will use GGUS the permissions and access rights schema needs to be adapted to their needs.
   If CSIRT will use GGUS the permissions and access rights schema needs to be adapted to their needs.
* Web portal
  Introduce alternative authentication/authorization processes
  Provide specific view for CMS VO
* Integration of operations portal in GGUS
* Ticket monitoring in GGUS
  Provide input on how processing tickets waiting for submitter's input
  Provide input on how processing tickets waiting for activity of technology providers after the end of EMI.

Latest revision as of 19:04, 24 December 2014

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Assessment of progress in 2012

Completed Activities and Milestones

  • GGUS Report Generator
 The GGUS report generator was re-designed from scratch. Some fine tuning is still to be done.
  • xGUS instances
 New xGUS instances have been introduced: France Grilles, NGI_SI
  • High availability of GGUS
 Implemented HA solution for Web Front-ends
 Implemented HA solution for Logic Servers
 Implemented on call duty service integration
 Intrusion prevention system implemented
  • GGUS Interfaces with other ticketing systems
 Improved interface with CERN SNOW ticketing system
 Implemented interface with new French ticketing system
  • New VOs in GGUS
 israelvo.isragrid.org.il, shiwa-workflow.eu, snoplus.snolab.ca, vo.cta.in2p3.fr, t2k.org, neurogrid.incf.org, comet.j-parc.jp
  • Mailing
 Migrated GGUS mail boxes to new mail infrastructure
 Review of VO specific mail boxes

Milestones not accomplished

  • Implementation of specific work flows for CSIRT/Security
 The CSIRT team is still evaluating whether they want to use GGUS.
 If CSIRT will use GGUS the permissions and access rights schema needs to be adapted to their needs.
  • DBMS on Virtual Environment migration Concept
 This concept couldn't be provided due to dependencies on other departments

Plans for 2013

  • GGUS Report Generator
 Some fine tuning is still to be done.
 Implement report [ETA accuracy]
  • VOMS synchronization
 Restructuring VOMS synchronization for making it fail-safe.
  • GGUS Interfaces with other ticketing systems
 Interface for PRACE/MAPPER
 Interface for DANTE
 Interface for NGI_IBERGRID
  • Alarm process for central operations tools
 Implement alarm process for EGI central operations tools
  • Implementation of specific work flows for CSIRT/Security
 The CSIRT team is currently evaluating whether they want to use GGUS.
 If CSIRT will use GGUS the permissions and access rights schema needs to be adapted to their needs.
  • Web portal
 Introduce alternative authentication/authorization processes
 Provide specific view for CMS VO
  • Integration of operations portal in GGUS
  • Ticket monitoring in GGUS
 Provide input on how processing tickets waiting for submitter's input
 Provide input on how processing tickets waiting for activity of technology providers after the end of EMI.