Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Plan 2013 Milestones"

From EGIWiki
Jump to navigation Jump to search
 
(11 intermediate revisions by 6 users not shown)
Line 1: Line 1:
{{Template:Op menubar}}
{{EGI-Inspire_menubar}}
{{Template:Inspire_reports_menubar}}  
{{TOC_right}}
{{TOC_right}}
[[Category:EGI-inSPIRE SA1]]
 
Specify the milestones for each quarter of the calendar year of 2013 and each SA1 task.
Specify the milestones for each quarter of the calendar year of 2013 and each SA1 task.


Line 22: Line 23:
**
**


= SA1.3 Staged rollout =
= SA1.3 Staged rollout =


*Q1
** Providing support to the current  UMD-1 and UMD-2 releases.
** Making a final effort to get EA to the missing components list
** Continuing to follow the Virtualization and Cloud Task Force, and assess it's implications to the SW provisioning.


* Q1
*Q2
**Providing support to the current UMD-1 and UMD-2 releases.
** Preparation of UMD-3 to include EMI-3 and IGE final releases.  
**Preparation of UMD-3 to include EMI-3 and IGE final releases.  
** Help in the campaign to decommission UMD-1 in favor of UMD-3 services  (whenever possible)
**Making a final effort to get EA to the missing components list [https://wiki.egi.eu/wiki/EGI_Quality_Criteria_Verification#Verification_engineer_skill_matrix].
** Start to evaluate and propose changes in order to Stage rollout in order to scope with the end of EMI/EGI projects ( this will not affect workflow). Close collaboration with SA2 team.
**Evaluate and propose changes and improvements in the SW workflow, in order to adapt to the Post-EMI/IGE. In order to fulfill this task, continue a close collaboration between SA1.3 and SA2 in order to accommodate the necessary changes.  
**Continuing to follow the Virtualization and Cloud Task Force, and access it's implications to the SW provisioning.
* Q2
**  
**  
**
*Q3  
* Q3
** Implementation of proposed changes to the Staged Rollout  workflow to the Post-EMI/IGE scenario
**  
*Q4  
**
** Continuing activities related with the SR process regarding the Post-EMI/IGE projects.
* Q4
**  
**


= SA1.3 Interoperations =
= SA1.3 Interoperations =
* Q1
* Q1
**  
** Definition of tests used for certification. As part of this activity tests will be included in set of operations tests (Mapper/QCG)
**
**
* Q2
* Q2
Line 49: Line 48:
**
**
* Q3
* Q3
**  
** Accounting, helpdesk integration with PRACE
**
**
* Q4
* Q4
Line 56: Line 55:


= SA1.4 Tools =
= SA1.4 Tools =
* Q1
**
**
* Q2
* Q2
**  
** GOCDBv5
**
** GOCDB: Automatic DNS switching to failover instance
* Q3
** OpsPortal: Improvement of sam-MSG-ops portal synchronization
**  
** OpsPortal: Availabilities and reliabilities report system
**
** OpsPortal: Refactoring dashboards
* Q4
* Q4
**  
** MSG: Enhance monitoring tools for PROD MSG network 
**
** MSG: Security implementation
** OpsPortal: Continuous integration
** SAM: Integration of EMI probes


= SA1.5 Accounting =
= SA1.5 Accounting =
Line 89: Line 87:
** Finish fine tuning on Report Generator
** Finish fine tuning on Report Generator
* Q2
* Q2
** Integration of operations portal
** Adapt interface to GOC DB: [[GOCDB/Doctrine]]
** Interface for NGI_IBERGRID
** Interface for NGI_IBERGRID
* Q3
* Q3
Line 96: Line 94:
* Q4
* Q4
** Introduce alternative authentication/authorization processes
** Introduce alternative authentication/authorization processes
**
** Integration of operations portal


= SA1.7 support =
= SA1.7 support =
Line 117: Line 115:
= SA1.8 Availability, core services, documentation =
= SA1.8 Availability, core services, documentation =
* Q1
* Q1
**  
** Finalization of EGI.eu OLA document
**
** Revision of suspension policy for sites
* Q2
* Q2
**  
** Upgrade of all intermediate site certification services
**
** Transition of Dteam VOMRS to VOMS (EMI3)
* Q3
* Q3
**  
** Decommission of dteam VO legacy groups (i.e. france) and decommissioned NGIs (i.e. NGI_IE)
**
* Q4
* Q4
**  
** Finalization of end user and site administrator knowledge base on EGI wiki
**

Latest revision as of 19:54, 24 December 2014

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Specify the milestones for each quarter of the calendar year of 2013 and each SA1 task.

SA1.2 Security

  • SVG plans
    • ...
  • Q1
  • Q2
  • Q3
  • Q4

SA1.3 Staged rollout

  • Q1
    • Providing support to the current UMD-1 and UMD-2 releases.
    • Making a final effort to get EA to the missing components list
    • Continuing to follow the Virtualization and Cloud Task Force, and assess it's implications to the SW provisioning.
  • Q2
    • Preparation of UMD-3 to include EMI-3 and IGE final releases.
    • Help in the campaign to decommission UMD-1 in favor of UMD-3 services (whenever possible)
    • Start to evaluate and propose changes in order to Stage rollout in order to scope with the end of EMI/EGI projects ( this will not affect workflow). Close collaboration with SA2 team.
  • Q3
    • Implementation of proposed changes to the Staged Rollout workflow to the Post-EMI/IGE scenario
  • Q4
    • Continuing activities related with the SR process regarding the Post-EMI/IGE projects.

SA1.3 Interoperations

  • Q1
    • Definition of tests used for certification. As part of this activity tests will be included in set of operations tests (Mapper/QCG)
  • Q2
  • Q3
    • Accounting, helpdesk integration with PRACE
  • Q4

SA1.4 Tools

  • Q2
    • GOCDBv5
    • GOCDB: Automatic DNS switching to failover instance
    • OpsPortal: Improvement of sam-MSG-ops portal synchronization
    • OpsPortal: Availabilities and reliabilities report system
    • OpsPortal: Refactoring dashboards
  • Q4
    • MSG: Enhance monitoring tools for PROD MSG network
    • MSG: Security implementation
    • OpsPortal: Continuous integration
    • SAM: Integration of EMI probes

SA1.5 Accounting

Includes the operations of both the accounting portal and the APEL central repository

  • Q1
  • Q2
  • Q3
  • Q4

SA1.6 Helpdesk

  • Q1
    • Restructuring VOMS synchronization
    • Finish fine tuning on Report Generator
  • Q2
  • Q3
    • Implementation of CMS specific portal and work flows
  • Q4
    • Introduce alternative authentication/authorization processes
    • Integration of operations portal

SA1.7 support

  • Q1
  • Q2
  • Q3
  • Q4
  • test resources.
  • Unknown Issue.
  • New Role.

SA1.8 Availability, core services, documentation

  • Q1
    • Finalization of EGI.eu OLA document
    • Revision of suspension policy for sites
  • Q2
    • Upgrade of all intermediate site certification services
    • Transition of Dteam VOMRS to VOMS (EMI3)
  • Q3
    • Decommission of dteam VO legacy groups (i.e. france) and decommissioned NGIs (i.e. NGI_IE)
  • Q4
    • Finalization of end user and site administrator knowledge base on EGI wiki