Difference between revisions of "EGI-InSPIRE:Plan 2012 SA1.7"
Line 5: | Line 5: | ||
== Network Support == | == Network Support == | ||
MILESTONE-1: Workflow for handling network-related tickets in GGUS implemented and operational, procedures understood and shared, known. | |||
Fully Achieved. There is a workflow in place for the GGUS Network Support Unit. ( Achieved 100 %). | |||
MILESTONE-2: HINTS system up and running, volunteering sites enrolled, pilot phase on-going | |||
MILESTONE-3: HINTS system in production mode, community of sites extended to the whole community of EGI sites willing to join. | |||
MILESTONE-4: Live-CD ready and available to the EGI sites for performing measurements and archiving data | |||
MILESTONE-5: Graphical User interface developed and available, complementing the tool provided functionality | |||
MILESTONE-6: Periodic reports from the GN3 PerfSONAR community to the EGI Network Support written and distributed. | |||
MILESTONE-7: Improved NetJobs GUI available | |||
MILESTONE-8: NetJobs in production mode, new sites enrolled, improved capacity measurements. | |||
MILESTONE-9: All approved and used Network Support tools documented | |||
MILESTONE-10: GUIs integrated in the operations portal or at least linked by it | |||
MILESTONE-11: Questionnaire produced and circulated to the NRENs, answers gathered, outcome provided to the EGI/EGI-Inspire Operations community. | |||
=''' Plans for 2012 '''= | =''' Plans for 2012 '''= | ||
MILESTONE 2012-1 | |||
MILESTONE 2012-2 | |||
MILESTONE 2012-3 | |||
MILESTONE 2012-4 | |||
== Network Support == | == Network Support == |
Revision as of 12:27, 7 December 2011
Assessment of progress, 2011
Network Support
MILESTONE-1: Workflow for handling network-related tickets in GGUS implemented and operational, procedures understood and shared, known. Fully Achieved. There is a workflow in place for the GGUS Network Support Unit. ( Achieved 100 %).
MILESTONE-2: HINTS system up and running, volunteering sites enrolled, pilot phase on-going
MILESTONE-3: HINTS system in production mode, community of sites extended to the whole community of EGI sites willing to join.
MILESTONE-4: Live-CD ready and available to the EGI sites for performing measurements and archiving data
MILESTONE-5: Graphical User interface developed and available, complementing the tool provided functionality
MILESTONE-6: Periodic reports from the GN3 PerfSONAR community to the EGI Network Support written and distributed.
MILESTONE-7: Improved NetJobs GUI available
MILESTONE-8: NetJobs in production mode, new sites enrolled, improved capacity measurements.
MILESTONE-9: All approved and used Network Support tools documented
MILESTONE-10: GUIs integrated in the operations portal or at least linked by it
MILESTONE-11: Questionnaire produced and circulated to the NRENs, answers gathered, outcome provided to the EGI/EGI-Inspire Operations community.
Plans for 2012
MILESTONE 2012-1 MILESTONE 2012-2 MILESTONE 2012-3 MILESTONE 2012-4