= Assessment of progress, 2011 = | = Assessment of progress, 2011 = | ||
== Middleware specific workflows prototyping == | |||
This task is done. Specific work flows for DMSU, EMI and the software release process are implemented and operational. | |||
== Report generator remodeling == | |||
The remodeling of the GGUS Report Generator is still on the roadmap for 2012 as further requirements came up. | |||
== Review support units == | |||
This task is done. Obsolete support units have been moved to the "Former support units" list in GGUS search engine. | |||
== High availability of GGUS == | |||
This task is ongoing. Further actions are required in 2012. | |||
== NGI integration == | |||
Currently 33 NGIs are integrated in GGUS, 10 with automatic interface to local ticketing systems. 4 of them are xGUS instances. | |||
This task is ongoing. | |||
== Application/Community support == | |||
= Plans for 2012 = | = Plans for 2012 = | ||
Line 15: | Line 28: | ||
* The CSIRT team is currently evaluating whether they want to use GGUS. | * The CSIRT team is currently evaluating whether they want to use GGUS. | ||
* If CSIRT will use GGUS the permissions and access rights schema needs to be adapted to their needs. | * If CSIRT will use GGUS the permissions and access rights schema needs to be adapted to their needs. | ||
== High | == High availability of GGUS == |
Revision as of 11:10, 2 December 2011
Assessment of progress, 2011
Middleware specific workflows prototyping
This task is done. Specific work flows for DMSU, EMI and the software release process are implemented and operational.
Report generator remodeling
The remodeling of the GGUS Report Generator is still on the roadmap for 2012 as further requirements came up.
Review support units
This task is done. Obsolete support units have been moved to the "Former support units" list in GGUS search engine.
High availability of GGUS
This task is ongoing. Further actions are required in 2012.
NGI integration
Currently 33 NGIs are integrated in GGUS, 10 with automatic interface to local ticketing systems. 4 of them are xGUS instances. This task is ongoing.
Application/Community support
Plans for 2012
GGUS Report Generator
- Presentation of first prototype on EGI Community Forum
- First version available for the EGI Review mid of the year
- Final version available by end of the year
Integration of further xGUS instances
- Finish integration of ROC_China
- New xGUS instance for NGI_Slovenia
Figure out which NGIs still are missing in GGUS
- Currently 33 NGIs are integrated in GGUS. Which NGIs are still missing?
- Russia is still appearing as ROC_Russia
Implementation of specific work flows for CSIRT/Security
- The CSIRT team is currently evaluating whether they want to use GGUS.
- If CSIRT will use GGUS the permissions and access rights schema needs to be adapted to their needs.