Difference between revisions of "EGI-InSPIRE:Plan 2012 SA1.6"
Jump to navigation
Jump to search
(Created page with '= Assessment of progress, 2011 = = Plans for 2012 =') |
|||
Line 2: | Line 2: | ||
= Plans for 2012 = | = Plans for 2012 = | ||
== GGUS Report Generator == | |||
* Presentation of first prototype on EGI Community Forum | |||
* First version available for the EGI Review mid of the year | |||
* Final version available by end of the year | |||
== Integration of further xGUS instances == | |||
* Finish integration of ROC_China | |||
* New xGUS instance for NGI_Slovenia | |||
== Figure out which NGIs still are missing in GGUS == | |||
* Currently 33 NGIs are integrated in GGUS. Which NGIs are still missing? | |||
* Russia is still appearing as ROC_Russia | |||
== Implementation of specific work flows for CSIRT/Security == | |||
* The CSIRT team is currently evaluating whether they want to use GGUS. | |||
* If CSIRT will use GGUS the permissions and access rights schema needs to be adapted to their needs. | |||
== High Availability == |
Revision as of 09:54, 2 December 2011
Assessment of progress, 2011
Plans for 2012
GGUS Report Generator
- Presentation of first prototype on EGI Community Forum
- First version available for the EGI Review mid of the year
- Final version available by end of the year
Integration of further xGUS instances
- Finish integration of ROC_China
- New xGUS instance for NGI_Slovenia
Figure out which NGIs still are missing in GGUS
- Currently 33 NGIs are integrated in GGUS. Which NGIs are still missing?
- Russia is still appearing as ROC_Russia
Implementation of specific work flows for CSIRT/Security
- The CSIRT team is currently evaluating whether they want to use GGUS.
- If CSIRT will use GGUS the permissions and access rights schema needs to be adapted to their needs.