EGI-InSPIRE:Plan 2012 SA1.5
Assessment of progress, 2011
The Accounting Repository and Portal were kept working reliably throughout 2011. The RGMA input interface was finally closed at the end of February with a number of migrations at the last minute, and later. Since the sites who left it late were generally those with lower levels of support, both internally and in their NGI, there was a heavy support load on the central repository team during this migration.
There were two(?) major releases of the portal in 2011. The first introduced the new GOCDB4 PI. The second was a major rewrite of the visualisation. Enhanced reports were also produced for WLCG. The whole portal infrastructure was virtualised in OpenNebula.
The apel-prod and apel-sync tests for SAM were made more reliable and publish into the latest SAM infrastructure via the production EGI messaging infrastructure.
The new SSM-based repository was released for testing by third-party accounting systems who currently publish summaries by direct database insertion. This was ready for production right at the end of the year but it was not thought wise to put it formally into production just before the holiday period.
Lots of discussions with Unicore, IGE, ARC on long-term plans for central accounting and interfacing their different solutions.
Participation in the EGI Virtualisation and Cloud Task Force on the accounting aspects of VM and Cloud usage.