Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Netherlands-QR8"

From EGIWiki
Jump to navigation Jump to search
 
(8 intermediate revisions by 2 users not shown)
Line 1: Line 1:
__NOTOC__
{{Template:EGI-Inspire menubar}}
 
{{Template:Inspire_reports_menubar}}
{{TOC_right}}
{| border="1" cellspacing="0" cellpadding="2"
{| border="1" cellspacing="0" cellpadding="2"
|-
|-
Line 50: Line 53:
|-
|-
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL)  
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL)  
|-
| march 6th
| Amsterdam
|BiG Grid all hands meeting
|
|-
|-
|march 26-30
|march 26-30
Line 55: Line 63:
|EGI Community Forum
|EGI Community Forum
|5
|5
|
|http://goo.gl/Ts8mW, http://goo.gl/vB2TV, http://goo.gl/wu4G9 and http://goo.gl/323CO
|-
|-
|}
|}
Line 78: Line 86:


===2.1. Progress Summary===
===2.1. Progress Summary===
We are replacing the Life Sciences Grid hardware. We have joined the Federated Cloud task force.
NIKHEF has installed IGE GRAM5.
===2.2. Main Achievements===
===2.2. Main Achievements===
 
The A/R metrics over february and march 2012 were: 97%/98%, 96%/96%. The availability of the top-level BDIIs was 100%. The ROD team did not exceed the ROD index thresholds.
NIKHEF has installed IGE GRAM5.


===2.3. Issues and mitigation===
===2.3. Issues and mitigation===

Latest revision as of 18:18, 9 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
8 NGI_NL SARA Ron Trompert


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
march 6th Amsterdam BiG Grid all hands meeting
march 26-30 Munich EGI Community Forum 5 http://goo.gl/Ts8mW, http://goo.gl/vB2TV, http://goo.gl/wu4G9 and http://goo.gl/323CO


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

We are replacing the Life Sciences Grid hardware. We have joined the Federated Cloud task force. NIKHEF has installed IGE GRAM5.

2.2. Main Achievements

The A/R metrics over february and march 2012 were: 97%/98%, 96%/96%. The availability of the top-level BDIIs was 100%. The ROD team did not exceed the ROD index thresholds. NIKHEF has installed IGE GRAM5.

2.3. Issues and mitigation