Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Netherlands-QR10"

From EGIWiki
Jump to navigation Jump to search
 
(10 intermediate revisions by 3 users not shown)
Line 1: Line 1:
[[Category:NGI QR Reports]]
 
__NOTOC__
{{Template:EGI-Inspire menubar}}
 
{{Template:Inspire_reports_menubar}}
{{TOC_right}}
{| border="1" cellspacing="0" cellpadding="2"
{| border="1" cellspacing="0" cellpadding="2"
|-
|-
Line 8: Line 11:
!scope="col"| Author  
!scope="col"| Author  
|-
|-
|9
|10
|NGI_NL
|NGI_NL
|SARA
|SARA
Line 37: Line 40:
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL)  
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL)  
|-
|-
|several days in may
|September 26th
|Amsterdam
|Amsterdam
|Turorials on Grid and Cloud
|BiGGrid and Beyond workshop
| 10
| 50
|
|http://www.biggrid.nl/big-grid-and-beyond-26-september-2012/
|-
|-
|}
|}
Line 51: Line 54:
|-
|-
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL)  
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL)  
|-
|17-21 september 2012
|Prague
|EGI TF12
|6
|https://indico.egi.eu/indico/conferenceTimeTable.py?confId=1019#20120917
|-
|-
|}
|}
Line 73: Line 82:


===2.1. Progress Summary===
===2.1. Progress Summary===
We have replaced the Life Sciences Grid hardware. Currently, we are busy to decommission the site HTC-BIGGRID. This site is going to be part of the Dutch Life Sciences grid. In a few months it will reappear as LSG-HTC. We have started up the RFC procedures for the procurement of new hardware. We have certified LSG-HUB and LSG-VU.
HTC-BIGGRID is now decommissioned. Currently we are in the process of reinstalling it to become part of the Dutch Life Sciences Grid. In a about one month it will reappear as LSG-HTC. We have started up the RFC procedures for the procurement of new hardware. We expect to have the hardware delayed in march next year. Currently we are in the process of upgrading the glite-3.1/3.2 services to EMI. We expect to be finished mid-November.


===2.2. Main Achievements===
===2.2. Main Achievements===
The availability of the top-level BDIIs was 100%. The ROD team did not exceed the ROD index thresholds. Certified two new sites. Upgraded our dCache to 2.2 which allows for protocols like webdav with httpBasicAuthentication which will be appreciated by a number of our users. We have an "appsportal" in production now. User applications can be put into this portal which will allow users to run their application on the grid and collect the output though the portal. So they don't come into direct contact with the grid at all.
The availability of the top-level BDIIs was 100%. The ROD team did not exceed the ROD index thresholds.


===2.3. Issues and mitigation===
===2.3. Issues and mitigation===

Latest revision as of 15:38, 7 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
10 NGI_NL SARA Ron Trompert


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
September 26th Amsterdam BiGGrid and Beyond workshop 50 http://www.biggrid.nl/big-grid-and-beyond-26-september-2012/

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
17-21 september 2012 Prague EGI TF12 6 https://indico.egi.eu/indico/conferenceTimeTable.py?confId=1019#20120917


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

HTC-BIGGRID is now decommissioned. Currently we are in the process of reinstalling it to become part of the Dutch Life Sciences Grid. In a about one month it will reappear as LSG-HTC. We have started up the RFC procedures for the procurement of new hardware. We expect to have the hardware delayed in march next year. Currently we are in the process of upgrading the glite-3.1/3.2 services to EMI. We expect to be finished mid-November.

2.2. Main Achievements

The availability of the top-level BDIIs was 100%. The ROD team did not exceed the ROD index thresholds.

2.3. Issues and mitigation

Issue Description Mitigation Description