Difference between revisions of "EGI-InSPIRE:Moldova-QR8"

From EGIWiki
Jump to: navigation, search
(2.1. Progress Summary)
(2.1. Progress Summary)
Line 83: Line 83:
 
The VT completed all the actions and launched the data collection on 25/Mar/2012 with a dedicated survey
 
The VT completed all the actions and launched the data collection on 25/Mar/2012 with a dedicated survey
 
Compendium survey was filled.
 
Compendium survey was filled.
 +
 +
For VT Website Content: Providing information about MD-NGI and adding MD-NGI logo to the dedicated DocDB page: https://documents.egi.eu/secure/ShowDocument?docid=911
  
 
Participation in EGI CF 2012 in Munich 26-30 March
 
Participation in EGI CF 2012 in Munich 26-30 March

Revision as of 11:28, 2 May 2012

Quarterly Report Number NGI Name Partner Name Author
...............8 RENAM


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

Providing support for the users on the MD-GRID CA operation and certs obtaining (Certifcates were isued for 3 new users)

Operation of MD-GRID CA

Participation in Virtual Team EGI Compendium https://wiki.egi.eu/wiki/VT_EGI_Compendium The VT completed all the actions and launched the data collection on 25/Mar/2012 with a dedicated survey Compendium survey was filled.

For VT Website Content: Providing information about MD-NGI and adding MD-NGI logo to the dedicated DocDB page: https://documents.egi.eu/secure/ShowDocument?docid=911

Participation in EGI CF 2012 in Munich 26-30 March

2.2. Main Achievements

Site MD-02-IMI was reinstalled and reconfigured with UMD distribution.
During EGI CF 2012 we solved last problems with MD-02-IMI and certified it
(Many thanks for that to Tiziana Ferrari and Peter Solagna)
Now we finish the assembly of servers and proceed to install the remaining
two sites

2.3. Issues and mitigation

Issue Description Mitigation Description