EGI-InSPIRE:Metrics Portal SA1 how to

From EGIWiki
Revision as of 17:04, 7 October 2011 by Psolagna (talk | contribs)
Jump to navigation Jump to search

How-To fill in the NGI metrics for the quarterly report

This wiki page provide a manual to use the Metrics portal to fill the quarterly metrics for SA1.

It is mainly addressed to the Operations Managers and their staff.

The instructions refer to the metrics for the quarter 6, if you are willing to fill the metrics for another quarter, please select the correct one.

Fill the SA1 NGI metrics

  1. Go to the metrics portal (metrics.egi.eu)
  2. On the menu on the left click on "Activity metrics"
  3. In the new page: in the box "Tasks by NGI" choose your NGI and select the "PQ6" in the drop down menus. Click on "Go to NGI tasks"
  4. In the new page: select the "SA1" activity and then "PQ6", then click again on "go to NGI tasks"
  5. In the new page click to "Edit" to change the values, or to add values in the empty cells
    Some metrics have suggested values, you can modify the suggested values if they are wrong. Please, always verify the suggested values.
  6. You can modify the table once you have submitted the page once.

Icons explanation

Icon Short description Description
Automatic This icon, before the metric value, means that the portal provides a suggested pre-calculated value, automatically calculated. The suggested values are recalculated once every day. If needed, the Operations Manager can change the pre-calculated values. See the other descriptions below
Unverified This icon, after the metric value, means that the cell contains the pre-calculated value. The figures have not been corrected or validated - as they are - by the Operations Manager.
Manual This icon, after the metric value, means that the Operations Manager changed the pre-calculated value