Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Macedonia-QR5"

From EGIWiki
Jump to navigation Jump to search
imported>Krakow
(No difference)

Revision as of 17:11, 22 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
QR5 NGI_MARGI Macedonia Boro Jakimovski


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
11-13.05.2011 Prague EUGridPMA meeting Boro Jakimovski, Bozidar Proevski Presented the MARGI CA self audit report


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?
Optimization of intermolecular interaction potential energy parameters for Monte-Carlo and molecular dynamics simulations Eighth International Conference on "Large Scale Scientific Computations", June 6-10, 2011, Sozopol, Bulgaria 1. Dragan Shahpaski
2. Ljupco Pejov
3. Anastas Mishev

2. ACTIVITY REPORT

2.1. Progress Summary

2.2. Main Achievements

  • Coordination and follow-up of security-related kernel update
  • Attendance or follow the minutes of OMB and Grid operations meetins
  • Regular site maintainance support within the NGI_MARGI
  • Coordination of middleware deployment and management of Grid operations in Macedonia
  • Operation of WMS/LB/VOMS/PX/LFC/BDII services for NGI_MARGI
  • All NGI_MARGI sites successfully implemented EGI Trust Anchor release 1.40 and change to EGI CA repository.
  • Performing regular gLite updates.
  • Operation of MARGI CA
  • Operation and maintenance of NGI_MARGI Nagios box
  • Perform a MARGI CA self audit and present the report on EUGridPMA meeting

2.3. Issues and mitigation

Issue Description Mitigation Description
There was a late update of MARGI CA CRL that resulted in failure of nagios tests and one site having lower availabilyty reported (in the yellow zone) Once the cern SE pulled the CRL (this took the longest) the site tests passed. This was reported in availability tickets for the sites